Collection number: MC 136 [Stored Offsite]
Size: 74 boxes
(24.66 cu.ft.)
About the Seacoast Anti-Pollution League
The Seacoast Anti-Pollution League (SAPL) was formed on March 29, 1969 in response to the Public Service Company of New Hampshire’s announcement of its intent to construct a nuclear power plant in Seabrook, New Hampshire. Although in response to the proposed plant, SAPL formulated its mission to encompass other seacoast New Hampshire environmental concerns. Even so, SAPL’s primary emphasis from inception through 1990 was on the Seabrook Plant.
From the time that PSNH began to survey the proposed location in Seabrook and to seek initial approval from state and federal government SAPL engaged in legal intervention to halt and/or hinder the process. Through these actions SAPL hampered the issuance of construction permits, forced changes in construction design in regards to the cooling tunnels of the plant, and sought various other changes in design to preserve the salt-marshes upon which the plant was built. As construction neared completion in the early 1980s SAPL’s emphasis shifted to concern about emergency preparedness and nuclear safety issues. It played a major role as intervenor in the various hearings before the NRC regarding issuance of an operating license to PSNH. Together with the Attorney General’s Office of Massachusetts and the New England Coalition on Nuclear Power, SAPL sought to prevent the issuance of an operating license on the grounds that the company’s and the state’s radiological emergency plans were inadequate for the assurance of public safety.
About the Seacoast Anti-Pollution League Papers
The Seacoast Anti-Pollution League Collection contains five series, primarily covering the years 1978 to 1989. Series 1 contains materials about the function and organization of SAPL and consists of office files, correspondence, financial materials, publications, and materials related to specific activities of the organization. These papers also reflect SAPL’s use of the court system to seek its ends where other intervention failed.
Series 2 contains reports analyzing safety and environmental concerns surrounding the construction and operation of the Seabrook Nuclear Power Plant, while Series 3 consists of materials relating to the issuance of a license for the construction of the plant. Series 4 comprises materials related to the fight over the issuance of an operating license. SAPL took an active role in seeking the denial of this license because of its concerns with emergency preparedness issues and nuclear safety. The papers in this series reflect SAPL’s emphasis on participation in the relevant hearings before the various boards of the NRC. Series 5 contains miscellaneous documents concerning the Seabrook Nuclear Power Plant from sources other than SAPL.
List of frequently used acronyms:
- AEC: Atomic Energy Commission (forerunner of NRC); also seen as USAEC
- ASLAB: Atomic Safety and Licensing Appeal Board of the NRC
- ASLB: Atomic Safety and Licensing Board of the NRC
- CWIP: Construction Work in progress
- EPZ: Emergency Planning Zone
- ETE: Evacuation Time Estimate
- FOIA: Freedom of Information Act
- MMWEC: Massachusetts Wholesale Municipal Electric Company
- NECNP: New England Coalition on Nuclear Pollution
- NHRERP: New Hampshire Radiological Emergency Response Plan
- NRC: Nuclear Regulatory Agency
- OL: Operating License
- PSCo: Public Service Company
- PSNH: Public Service of New Hampshire
- PUC: Public Utilities Commission
- RERP: Radiological Emergency Response Plan
- SAPL: Seacoast Anti-Pollution League
Box numbering starts over with each of the 5 series. It is thus important to specify the series number when requesting materials from this collection.
Administrative Information
Access Restrictions
This collection is open.
Copyright Notice
Contents of this collection are governed by U.S. copyright law. For questions about publication or reproduction rights, contact Special Collections staff.
Preferred Citation
[Identification of item], [Folder number], [Box number], Seacoast Anti-Pollution League Papers, 1968-1989, MC 136, Milne Special Collections and Archives, University of New Hampshire Library, Durham, NH, USA.
Acquisitions Information
Donations: Jean Lincoln, October 19, 1991; Charles Pratt, January 26, 1994 and December 22, 1994; Seacoast Anti-Pollution League, December 8, 1998 (Accession numbers: 9107, 94.005, 94-046, 98.018)
Collection Arrangement
This collection is arranged into five series, some of which are in turn divided into further subseries. The material is mostly arranged chronologically within each series and subseries.
Collection Contents
- Series 1: Seacoast Anti-Pollution League History and Organization, 1970-1989
- Series 2: Preliminary Studies and Ecological Surveys Regarding Seabrook Nuclear Power Plant, 1969-1986
- Series 3: Seabrook Construction Licensing Issues, 1972-1978
- Series 4: Operating License Issues 50-443-OL, 50-444-OL, 1969-1986
- Series 5: Miscellaneous Seabrook Documents from Soruces Other than SAPL, 1974-1988
Series 1: Seacoast Anti-Pollution League History and Organization, 1970-1989
(8 Boxes)Subseries A: History
Box 1 | ||
---|---|---|
Box 1, Folder 1 | SAPL History, Chronologies | |
Box 1, Folder 2 | SAPL History, SAPL Statements | |
Box 1, Folder 3 | SAPL History, Reports and Studies Primarily about SAPL |
Subseries B: Office Matters
Box 1, Folder 4 | Phone Logs, dates unclear | |
Box 1, Folder 5 | 1981, SAPL Phone Lists | |
Box 1, Folder 6 | April l988, Conference Calls | |
Box 1, Folder 7 | 1979-1989, Minutes of SAPL Meetings | |
Box 1, Folder 8 | 1980, Field Director Job Applicants |
Subseries C: Finances
Box 1, Folder 9 | Miscellaneous Finances | |
Box 1, Folder 10 | 1977-1983, Fundraising, Phone Solicitations | |
Box 1, Folder 11 | 1982, Fundraising, Seacoast Jazz Festival | |
Box 1, Folder 12-13 | 1982, Fundraising, Road Race | |
Box 1, Folder 14 | 1983-1985, Fundraising, SAPL Members Renewal Project | |
Box 1, Folder 15 | 1983, Fundraising, Inquiries to Tom Rush re. benefit concert | |
Box 1, Folder 16 | 1983, Fundraising, Dinner for 2 Raffle | |
Box 1, Folder 17 | SAPL Canvass | |
Box 1, Folder 18 | Donations and Requests for Information | |
Box 1, Folder 19 | Fundraising, T-Shirt Marketing | |
Box 1, Folder 20 | Current fundraisers, "Spring Into Summer" Raffle | |
Box 1, Folder 21 | Fundraising, Miscellaneous | |
Box 1, Folder 22 | Advertising Ideas | |
Box 1, Folder 23 | Master Copies of Mailings |
Subseries D: Correspondence
Box 2 | ||
---|---|---|
Box 2, Folder 1 | 1970-1979, Correspondence to SAPL | |
Box 2, Folder 2 | 1980, Correspondence to SAPL | |
Box 2, Folder 3 | 1981, Correspondence to SAPL | |
Box 2, Folder 4 | 1981, Correspondence to SAPL re. Industrial Development in Kingston, NH | |
Box 2, Folder 5 | 1982, Correspondence to SAPL | |
Box 2, Folder 6 | 1982, March 1, Correspondence to SAPL from Alexander Sidar re: "The Seabrook Disaster Book Idea" | |
Box 2, Folder 7 | 1983, Correspondence to SAPL | |
Box 2, Folder 8 | 1984, Correspondence to SAPL | |
Box 2, Folder 9 | 1984, Correspondence from Dan Tuthill to SAPL | |
Box 2, Folder 10 | 1985, Correspondence to SAPL | |
Box 2, Folder 11 | 1986, Correspondence to SAPL | |
Box 2, Folder 12 | 1987, Correspondence to SAPL | |
Box 2, Folder 13 | 1988, Correspondence to SAPL | |
Box 2, Folder 14 | 1989, Correspondence to SAPL | |
Box 2, Folder 15 | Undated Correspondence to SAPL | |
Box 2, Folder 16 | 1973-1979, Correspondence from SAPL | |
Box 2, Folder 17 | 1980, Correspondence from SAPL | |
Box 2, Folder 18 | 1981, Correspondence from SAPL | |
Box 2, Folder 19 | 1982, Correspondence from SAPL | |
Box 2, Folder 20 | 1983, Correspondence from SAPL | |
Box 2, Folder 21 | 1984, Correspondence from SAPL | |
Box 2, Folder 22 | 1985, Correspondence from SAPL | |
Box 2, Folder 23 | 1986, Correspondence from SAPL | |
Box 2, Folder 24 | 1987, Correspondence from SAPL | |
Box 2, Folder 25 | 1988, Correspondence from SAPL | |
Box 2, Folder 26 | Undated Correspondence from SAPL | |
Box 2, Folder 27 | Miscellaneous Correspondence |
Subseries E: Publications
(see also: Series 1, Box 9)
Box 3 | ||
---|---|---|
Box 3, Folder 1 | 1978-1989, SAPL Press Releases | |
Box 3, Folder 2 | 1984, Sept 4, Press Release with draft material | |
Box 3, Folder 3 | 1972-1989, SAPL News | |
Box 3, Folder 4 | 1982, Newsletter Material | |
Box 3, Folder 5 | 1983, Newsletter Material | |
Box 3, Folder 6 | 1984, [October?], Newsletter Material | |
Box 3, Folder 7 | Articles Reprinted by SAPL | |
Box 3, Folder 8 | Flyers and Other Printed Material | |
Box 3, Folder 9 | Informational Flyers |
Subseries F: SAPL Activities
Box 3 | ||
---|---|---|
Box 3, Folder 10 | 1972-1978, SAPL Testimony | |
Box 3, Folder 11 | 1973-1981, General SAPL Activities and Statements | |
Box 3, Folder 12 | 1982, May, Oyster River School Student Comments on SAPL Talk | |
Box 3, Folder 13 | 1982, SAPL vs. NRC, 690 f. 2d. 1025, before US Court of Appeals | |
Box 3, Folder 14 | 1983, Results of SAPL Survey of Radiological Emergency Response Plan[RERP], SAPL Hospital Survey | |
Box 3, Folder 15 | 1983, Notes re. RERP Survey, SAPL Hospital Survey | |
Box 3, Folder 16 | 1983, Correspondence re. RERP Survey, SAPL Hospital Survey | |
Box 3, Folder 17 | 1983, Responses to SAPL RERP Survey, SAPL Hospital Survey | |
Box 3, Folder 18 | 1983, Responses to SAPL RERP Survey, SAPL Hospital Survey | |
Box 3, Folder 19 | 1983, Negative Responses to SAPL RERP Survey, SAPL Hospital Survey | |
Box 3, Folder 20 | 1983, Background Files, RERP Survey of NY Public Interest Research Group, 1982, SAPL Hospital Survey | |
Box 3, Folder 21 | 1983, Background Files, Materials from Dr. Tye's Study re. RERP, SAPL Hospital Survey | |
Box 3, Folder 22 | 1983, Background Files, [1982-1983], Miscellany re. RERP Survey of Hospital Emergency Prep | |
Box 4 | ||
Box 4, Folder 1 | 1983-1984, Beach Survey | |
Box 4, Folder 2 | 1986, Signatures on Petitions re Emergency Response Planning |
Subseries G: Miscellaneous Notes
Box 4, Folder 3 | Notes for SAPL's Brief in support of Appeal of Issuance of Partial Operating License before ASLAB | |
Box 4, Folder 4 | Notes on Applicant's Response to Interrogatories | |
Box 4, Folder 5 | Work Papers, Contentions | |
Box 4, Folder 6 | Work Papers, Contentions | |
Box 4, Folder 7 | Work Papers, re SAPL Contentions | |
Box 4, Folder 8 | Draft SAPL Proposed findings of Fact and Conclusions of Law and Proposed Form of Decision | |
Box 4, Folder 9 | Draft of SAPL 4th. Supplemental Petition for Leave to Intervene, re Evacuation Time Estimates, [c.1985] | |
Box 4, Folder 10 | 1986, March 25-26, Notes on Prehearing Conference | |
Box 4, Folder 11 | 1986, Work Papers, SPDS Issues, re SAPL actions vis a vis NH Contention 10, 1986 and following | |
Box 4, Folder 12 | 1986, May 15, Draft of SAPL Contention #31, SAPL 4th Supplemental Petition for Leave to Intervene | |
Box 4, Folder 13 | Unidentified Notes |
Subseries H: Files on Other Activist Groups
Box 4 | ||
---|---|---|
Box 4, Folder 14 | Appeal To Reason | |
Box 4, Folder 15 | 1982-1984, Atlantic Center for the Environment | |
Box 4, Folder 16 | Citizen Alert | |
Box 4, Folder 17 | Citizen's Clearinghouse on Toxic Waste | |
Box 4, Folder 18 | 1980, CEPAG (Citizen's Energy Policy Advisory Group), CEPAG Report | |
Box 4, Folder 19 | 1977, Citizen's Movement for Safe and Efficient Energy (CMSEE), Critical Mass Journal | |
Box 5 | ||
Box 5, Folder 1 | 1978, CMSEE, Critical Mass Journal | |
Box 5, Folder 2 | Clamshell Alliance and Affiliated Groups | |
Box 5, Folder 3 | 1987, February to June, Coalition for Reliable energy, (Industry Front Group) | |
Box 5, Folder 4 | Committee to Bridge the Gap | |
Box 5, Folder 5 | Critical Mass Energy Project | |
Box 5, Folder 6 | Critical Mass Energy Project | |
Box 5, Folder 7 | Employee's Legal Project, Workers Legal Union | |
Box 5, Folder 8 | Energy Systems Research Group | |
Box 5, Folder 9 | Environmental Action Foundation, Conference and Other Material | |
Box 5, Folder 10 | Environmental Policy Institute, Conference on Nuclear Waste, Options for the Future | |
Box 5, Folder 11 | 1980-1983, Midcoast Health Research Group | |
Box 5, Folder 12 | 1980-1983, Midcoast Health Research Group | |
Box 6 | ||
Box 6, Folder 1 | Miscellaneous Advocacy Groups | |
Box 6, Folder 2-3 | 1983, March, National Nuclear Intervenors Conference | |
Box 6, Folder 4 | Natural Rights | |
Box 6, Folder 5 | New England Coalition on Nuclear Pollution | |
Box 6, Folder 6 | New England Peace Movement Newsletter | |
Box 6, Folder 7 | 1982-1987, New Hampshire Natural Resources Forum | |
Box 6, Folder 8 | Nuclear Control Institute | |
Box 6, Folder 9 | Nuclear Information Research Center | |
Box 6, Folder 10 | Public Citizen Critical Mass Energy Project | |
Box 6, Folder 11 | Radioactive Waste Campaign | |
Box 6, Folder 12-15 | Safe Energy Communication Council (SECC) | |
Box 7 | ||
Box 7, Folder 1 | 1987, February, Tri-State Coalition for Public Safety | |
Box 7, Folder 2 | Union of Concerned Scientists | |
Box 7, Folder 3 | 1981, United Nuclear Opponents | |
Box 7, Folder 4 | 1982-1983, United Nuclear Opponents | |
Box 7, Folder 5 | Vermont Public Interest Research Group | |
Box 7, Folder 6 | Viewpoint | |
Box 7, Folder 7 | Other Nuclear Group Stuff |
Subseries I: Miscellaneous
Box 7 | ||
---|---|---|
Box 7, Folder 8 | 1985-1988, "Bob's Articles," Articles by Robert Backus | |
Box 7, Folder 9 | 1987, Forum on Radiological Emergency Response and Seabrook Nuclear Power Plant: Safety Issues and Concerns for Educational Institutions | |
Box 7, Folder 10 | Information on Karen Silkwood | |
Box 7, Folder 11 | 1985, Leadership Conference on Nuclear Waste | |
Box 7, Folder 12 | Miscellaneous | |
Box 7, Folder 13 | 1982, New England Environmental Conference | |
Box 8 | ||
Box 8, Folder 1 | NRC Miscellany | |
Box 8, Folder 2 | Pamphlets on effective Use of Government and Media Resources | |
Box 8, Folder 3 | 1981, Portsmouth Gasohol Plant | |
Box 8, Folder 4 | Public Citizen's Nuclear Waste Study | |
Box 8, Folder 5 | 1979, September, "Unique Wildlife Ecosystem Concept Plan State of New Hampshire," U.S. Dept. of Interior, U.S. Fish and Wildlife Service | |
Box 8, Folder 6 | Chris Wood's Paper on State's Rights in Nuclear Licensing | |
Box 9 | ||
Box 9, Folder 1 | SAPL Flyers and Flyer Material | |
Box 9, Folder 2 | 1981, SAPL Petition re Emergency Planning |
Series 2: Preliminary Studies and Ecological Surveys Regarding Seabrook Nuclear Power Plant, 1969-1986
(6 Boxes)Box 1 | ||
---|---|---|
Box 1, Folder 1 | 1969-1970, Seabrook Ecological Study: Phase I, Hampton Seabrook Estuary, NH | |
Box 1, Folder 2 | 1971, Seabrook Ecological Study | |
Box 1, Folder 3 | 1972-1975, Summary Report of Hydrographic Studies Off Hampton Beach, NH, Sept 1972 to March 1975 | |
Box 1, Folder 4 | 1972, October, Report on the Terrestrial effects of Salt Fallout from Thermal Cooling Systems | |
Box 1, Folder 5 | 1972, October, Evaluation of Environmental Effects from Evaporative Heat Dissipation Systems at the Seabrook Site | |
Box 1, Folder 6 | 1972, November, Seabrook Station: Land Planning and Site Design Study | |
Box 2 | ||
Box 2, Folder 1 | 1972, December, An Interim Progress Report on the Environmental Study Program Hampton-Seabrook Estuary and Near Offshore Waters | |
Box 2, Folder 2 | 1972-1973, Environmental Study Program, Hampton-Seabrook Estuary and Near Offshore waters | |
Box 2, Folder 3 | 1975, "Summary Reports on Hydrographic Studies Off Hampton Beach, NH, Including the Hampton Harbor Estuary and the Western Gulf of Maine, September 1972 to March 1975," Technical Report VI-8 | |
Box 2, Folder 4 | 1973, June, Seabrook Station Preliminary Safety Analysis Report (vol.II), 1 of 7 | |
Box 2, Folder 5-9 | 1973, June, Preliminary Safety Analysis | |
Box 3 | ||
Box 3, Folder 1 | 1973, June, Preliminary Safety Analysis | |
Box 3, Folder 2 | 1973, June, Seabrook Ecological Study, "The Benthos of the Area Offshore Hampton and Seabrook Beaches, NH," Tech Report IV-5 | |
Box 3, Folder 3 | 1973, July, Seabrook Station Preliminary Safety Analysis Report, Amendment 1, revision pages | |
Box 3, Folder 4 | 1973-1974, "Finfish Ecology Investigations at the Hampton-Seabrook Estuary, NH and Adjoining Coastal Waters," Technical Report V-3 | |
Box 3, Folder 5-9 | 1974, January, Seabrook Station Preliminary Safety Analysis Report, Amendment 5 | |
Box 4 | ||
Box 4, Folder 1-4 | 1974, January, Preliminary Safety Analysis Report | |
Box 4, Folder 5 | 1974, May, Geologic, Seismologic and Rock Mechanic Investigations for Seabrook Station | |
Box 4, Folder 6 | 1973-1974, "Hydrothermal Studies of Diffuser Discharge in the Coastal Environment: Seabrook Station for PSCNH" | |
Box 4, Folder 7 | 1974, August 14, Safety Evaluation of the Seabrook Nuclear Power Station, Units 1 and 2, issue date 8/14/74; supplement 8/20/74 | |
Box 4, Folder 8 | 1974, August 20, Supplement no.1 to the Safety Evaluation Report by Directorate of Licensing USAEC in matter of PSNH | |
Box 4, Folder 9 | 1974, October, Seabrook Station Containment Aircraft Impact Analysis | |
Box 4, Folder 10 | 1974, October 8, Supplement no.2 | |
Box 4, Folder 11 | 1974, December, Roadway Network and Evacuation Study | |
Box 4, Folder 12 | 1974-1975, Seabrook Ecological Study, 1975, "Finfish Ecology Investigations at the Hampton-Seabrook Estuary, NH and Adjoining Coastal Waters," Tech. report VI-7 | |
Box 4, Folder 13 | 1975, March 14, Supplement #3 to the Safety Evaluation Report | |
Box 4, Folder 14 | 1975, June, "The Benthos Inhibiting the Area of the Proposed location of the Seabrook Station Intake" | |
Box 5 | ||
Box 5, Folder 1 | 1975 to 1976, "The Spatial and Temporal distribution of the Larvae of the Soft-Shelled Clam, Mya Arenaia, in NH Coastal Waters, 7/75 to 11/76," Tech Report VI-10 | |
Box 5, Folder 2 | 1975, Nov 14, Supplement #4 to the Safety Evaluation Report | |
Box 5, Folder 3 | 1975, December, "Probability of Coastal Waters Entering the Hampton Harbor Estuary and Neighboring Estuaries as a Function of Distance and Depth Offshore," Tech. Report VI-9 | |
Box 5, Folder 4 | 1975, Basic Findings of Fact by the Bulk Power Site Evaluation Committee in Connection with the Proposed Nuclear Generating Facility at Seabrook, NH | |
Box 5, Folder 5 | 1977, December, Summary Document: Assessment of Anticipated Impacts of Construction and Operation of Seabrook Station on the Estuarine, Coastal and Offshore Waters of Hampton-Seabrook, NH | |
Box 5, Folder 6 | 1982, May, Draft Environmental Statement Related to the Operation of Seabrook Station | |
Box 5, Folder 7 | 1982, August, Probabilistic Risk Assessment, "Seabrook Station Probabilistic Safety Assessment," pp.1-99 | |
Box 5, Folder 8 | 1982, August, Probabilistic Risk Assessment, pp.100-end | |
Box 5, Folder 9 | 1982, December, Final Environmental Statement Related to Operator of Seabrook Station, Units 1 and 2, USNRC, Dept. of Nuclear Reactor Regulation | |
Box 6 | ||
Box 6, Folder 1 | 1984, January to June, Sea Grant Coastal Access Study | |
Box 6, Folder 2 | 1986, July, Safety Evaluation Report Related to the Operation of Seabrook Station Units 1 and 2 |
Series 3: Seabrook Construction Licensing Issues, 1972-1978
(15 Boxes)Box 1 | ||
---|---|---|
Box 1, Folder 1 | 1972, March 31, PSCNH Long range Plans for Bulk Power Supply Facilities | |
Box 1, Folder 2 | 1972, October 3, State of New Hampshire Joint Hearings of the Public Utilities Commission[PUC] and the Site Evaluation Committee, vol.5, pp.706 to 876 | |
Box 1, Folder 3 | 1972, October 4, Joint Hearings, vol.6, pp.787 to 1047 | |
Box 1, Folder 4 | 1972, October, Joint Hearings, vol.7, pp.1048 to 1271 | |
Box 1, Folder 5 | 1972, October 31, Joint Hearings, vol.9, pp. 1495 to 1589 | |
Box 1, Folder 6 | Joint Hearings, vol.11, pp. 1886 to 2050 | |
Box 2 | ||
Box 2, Folder 1 | 1972, November, Joint Hearings, vol.12, pp.2051 to 2235 | |
Box 2, Folder 2 | 1972, November, Joint Hearings, vol.13, pp.2236 to 2402 | |
Box 2, Folder 3 | 1972, November 21, Joint Hearings, vol.14, pp.2403 to 2641 | |
Box 2, Folder 4 | 1972, December 6, Joint Hearings, vol.15, pp.2642 to 2790 | |
Box 2, Folder 5 | 1972, December 12, Joint Hearings, vol.17, pp.2894 to 3037 | |
Box 2, Folder 6 | 1972, December 19, Joint Hearings, vol.l8, pp.3038 to 3174 | |
Box 3 | ||
Box 3, Folder 1 | 1973, January 11, Joint Hearings, vol.19, pp.3175 to 3361 | |
Box 3, Folder 2 | 1973, January 12, Joint Hearings, vol.20, pp.3362 to 3489 | |
Box 3, Folder 3 | 1973, January 18, Joint Hearings, vol.21, pp.3490 to 3596 | |
Box 3, Folder 4 | 1973, February 8, Joint Hearings, vol.22, pp.3597 to 3815 | |
Box 3, Folder 5 | 1973, February 9, Joint Hearings, vol.23, pp.3816 to 3941 | |
Box 3, Folder 6 | 1973, February 9, Joint Hearings, vol.23, pp.3942 to 4082 | |
Box 3, Folder 7 | 1973, March 8, Joint Hearings, vol.24, pp.4083 to 4288 | |
Box 4 | ||
Box 4, Folder 1 | 1973, March 9, Joint Hearings, vol.25, pp.4289 to 4460 | |
Box 4, Folder 2 | 1973, March 22, Joint Hearings, vol.26, pp.4461 to 4686 | |
Box 4, Folder 3 | 1973, March 23, Joint Hearings, vol.27, pp.4687 to 4930 | |
Box 4, Folder 4 | 1973, April 13, Joint Hearings, vol.29, pp.5103 to 5308 | |
Box 4, Folder 5 | 1973, May 4, Joint Hearings, vol.30, pp.5309 to 5423 | |
Box 5 | ||
Box 5, Folder 1 | 1973, May 21, Joint Hearings, vol.31, pp.5454 to 5544 | |
Box 5, Folder 2 | 1973, May 21, Joint Hearings, vol.31, pp.5545 to 5663 | |
Box 5, Folder 3 | 1973, May 25, Joint Hearings, vol.32, pp.5664 to 5776 | |
Box 5, Folder 4 | 1973, May 25, Joint Hearings, vol.32, pp.5777 to 5880 | |
Box 5, Folder 5 | 1974, February 4, Testimony of Dr. Charles Chichetti and William Gillen before the State of NH PUC and Bulk Power Supply Site Committee, l of 4 | |
Box 5, Folder 6 | 1974, February 4, Testimony, 2 of 4 | |
Box 5, Folder 7 | 1974, February 4, Testimony, 3 of 4 | |
Box 5, Folder 8 | 1974, February 4, Testimony, 4 of 4 | |
Box 5, Folder 9 | 1974, March 11, Public Hearings before the US Atomic Energy Commission, vol.2, pp.93 to 332 | |
Box 6 | ||
Box 6, Folder 1 | 1974, December 12, Public Hearings, vol.5, pp.634 to 748 | |
Box 6, Folder 2 | 1975, April 16, Public Hearings, vol.6, pp.749 to 970 | |
Box 6, Folder 3 | 1975, May 29, Public Hearings, vol.9, pt.1, pp.1327 to 1448 | |
Box 6, Folder 4 | 1975, May 29, Public Hearings, vol.9, pt.2, pp.l449 to 1601 | |
Box 6, Folder 5 | 1975, May 30, Public Hearings, vol.10, pt.1, pp.l602 to 1732 | |
Box 6, Folder 6 | 1975, May 30, Public Hearings, vol.10, pt.2, pp.1733 to 1866 | |
Box 7 | ||
Box 7, Folder 1 | 1975, June 30, Public Hearings, pp.4217 to 4397 | |
Box 7, Folder 2 | 1975, July 1, Public Hearings, vol.14, pp.4398 to 4591 | |
Box 7, Folder 3 | 1975, July 2, Public Hearings, vol.15, pp.4592 to 4774 | |
Box 7, Folder 4 | 1975, July 3, Public Hearings, vol.16, pp.4775 to 4957 | |
Box 7, Folder 5 | 1975, August 26, Public Hearings, vol.l7, pp.4958 to 5174 | |
Box 8 | ||
Box 8, Folder 1 | 1975, August 27, Public Hearings, vol.18, pp.5175 to 5313 | |
Box 8, Folder 2 | 1975, August 28, Public Hearings, vol.l9, pp.5314 to 5538 | |
Box 8, Folder 3-4 | 1975, September 3, Public Hearings, pp.5709 to 5818, with Final Environmental Impact Statement, 1 of 2 | |
Box 8, Folder 5 | 1975, September 17, Public Hearings, vol.22, pp.7108 to 7315 | |
Box 9 | ||
Box 9, Folder 1 | 1975, October 22, Public Hearings, vol.32, pp.9857 to 10070 | |
Box 9, Folder 2 | 1975, October 23, Public Hearings, vol.33, pp.10071 to 10270 | |
Box 9, Folder 3 | 1975, October 24, Public Hearings, vol.34, pp.10271 to 10415 | |
Box 9, Folder 4 | 1975, October 29, Public Hearings, vol.36, pp.10621 to 10747 | |
Box 9, Folder 5 | 1975, October 30, Public Hearings, vol.37, pt.1, 10748 to 10840 | |
Box 9, Folder 6 | 1975, October 30, Public Hearings, vol.37, pt.2, 10841 to 10969 | |
Box 10 | ||
Box 10, Folder 1 | 1975, [November 1], Public Hearings, vol.38, pp.10970 to 11053 | |
Box 10, Folder 2 | 1975, November 4, Public Hearings, vol.39, pt.1, pp.11054 to 11006 | |
Box 10, Folder 3 | 1975, November 4, Public Hearings, vol.39, pt.2, Applicants Direct Testimony #23 | |
Box 10, Folder 4 | 1975, November 4, Public Hearings, vol.39, pt.3, pp.1107 to 11229 | |
Box 10, Folder 5 | 1975, November 5, Public Hearings, vol.40, pp.11230 to 11406 | |
Box 10, Folder 6 | 1975, November 6, Public Hearings, vol.41, pt.1, pp.11407 to 11426 | |
Box 10, Folder 7 | 1975, November 6, Public Hearings, vol.41, pt.2, pp.11427 to 11579 | |
Box 10, Folder 8 | 1975, November 7, Public Hearings, vol.42, pp.11580 to 11656 | |
Box 11 | ||
Box 11, Folder 1 | 1975, November 18, Public Hearings, vol.43, pp.11657 to 11835 | |
Box 11, Folder 2 | 1975, November 24, Public Hearings, vol.44, pp.12018 to 12217 | |
Box 11, Folder 3 | 1976, February 25, Public Hearings, vol.45, pp.12218 to 12419 | |
Box 11, Folder 4 | 1976, February 27, Public Hearings, pp.12674 to 12714 | |
Box 11, Folder 5 | 1974, Seabrook Master Schedules, Revised as of January 1974 | |
Box 11, Folder 6 | 1974, PSCo Responses to Intervenors | |
Box 11, Folder 7 | 1975, February 7, Information Submitted to EPA in Connection with PSCoNH Application for a 316(a) Exemption | |
Box 12 | ||
Box 12, Folder 1 | 1975, May 21, Memorandum and Order, (ALAB-271) | |
Box 12, Folder 2 | 1975, June 18, Letter from Bruce Bekley, project manager PSNH, to Dr. R. P. Geckel, project manager USNRC | |
Box 12, Folder 3 | 1975, July 30, Letter, Gossick to Thompson | |
Box 12, Folder 4 | 1975, August, Affidavit, Testimony of James Gekas of Federal Power Commission before ASLB | |
Box 12, Folder 5-9 | 1975, August, Fire Protection System Evaluation and Comparison to Branch Technical Position | |
Box 12, Folder 10 | 1975, September 2, New England Coalition on Nuclear Pollution Testimony on Energy Alternatives | |
Box 12, Folder 11 | 1975, September 4, Commonwealth of Massachusetts Testimony on Alternative Energy Sources I, Solid Waste Resource Recovery Before ASLB | |
Box 12, Folder 12 | 1975, November 11, Motion for Reconsideration of Board Decision Not to Extend Hearings on Cost-Benefit Issue | |
Box 12, Folder 13 | 1975, December 15, Requests for Proposed Findings of Facts and Rulings of Law Submitted by SAPL and the Audubon Society of NH | |
Box 12, Folder 14 | 1975, December 16, Applicant's response to Motion of NECNP et al, ASLAB and ALSB | |
Box 12, Folder 15 | 1975, December, Applicant's Proposed Findings of Fact and Conclusions of Law in the Form of a Proposed finding of Law | |
Box 12, Folder 16 | [1975], NRC Staff Testimony on Cost-Benefit Analysis, before ASLB | |
Box 12, Folder 17 | 1976, February 18, Applicant's Response to SAPL Renewed Motion to Reopen Hearing Filed on Behalf of Intervenor SAPL on Issue of Financial Qualifications | |
Box 12, Folder 18 | 1976, February 26, Testimony of Robert Mitchell before ASLB | |
Box 12, Folder 19 | 1976, July 20, Affidavit of Bruce B. Beckley before ASLB | |
Box 13 | ||
Box 13, Folder 1 | 1976, September 17, Brief of Applicant in Support of Its Exceptions | |
Box 13, Folder 2 | 1976, September 30, Memorandum and Order | |
Box 13, Folder 3 | 1976, October 6, Memorandum and Order | |
Box 13, Folder 4 | 1976, October 18, On Review of a Decision of the ASLAB, Brief of Applicants before NRC | |
Box 13, Folder 5 | 1976, October, NRC, Start of Cooling System Trouble | |
Box 13, Folder 6 | 1976, October, Applicant's Presentation Concerning SAPL and Audubon Motion for Reconsideration of ALAB-338 in Light of Court Order of Oct.8, 1976 | |
Box 13, Folder 7 | 1976, November 5, Memorandum and Order | |
Box 13, Folder 8 | 1976, November 12, Brief of Applicant's in Opposition to Certain Exceptions of Other Parties on exception to the Initial decision of the ASLB | |
Box 13, Folder 9 | 1976, November l2, NRC Staff Brief in Response to the Exceptions to the Initial Decision of All Other Par ties | |
Box 13, Folder 10 | 1976, November, EPA, Region I, Initial Decision | |
Box 13, Folder 11 | 1976, November to December, Start of Cooling Trouble | |
Box 13, Folder 12-13 | 1976-1979, Testimony, Miscellaneous | |
Box 13, Folder 14 | 1976, Atomic Safety and Licensing Board | |
Box 14 | ||
Box 14, Folder 1-2 | 1976, Atomic Safety and Licensing Board | |
Box 14, Folder 3 | 1976-1977, Fire Protection for Nuclear Plants | |
Box 14, Folder 4 | 1977, January 31, Applicant's Response to Inquiries of the Commissioner for Further Stay of Order Suspending Construction Permits, Brief of Applicants on Merit | |
Box 14, Folder 5 | 1977, January, ALSAB | |
Box 14, Folder 6 | 1977, January to March, NRC re. Cooling Tunnels, Alternate Sites | |
Box 14, Folder 7 | 1977, January to November, ALSB | |
Box 14, Folder 8 | 1977, February 11, On Review of a Decision of the ASLAB, Brief of Applicants in response to the Commission's Order of February 7, 1977 | |
Box 14, Folder 9 | 1977, February 11, Commonwealth of Massachusetts Reply to Commission's Order of February 7, 1977 | |
Box 14, Folder 10 | 1977, February 19, NECNP Response to Commission Order of February 7, 1977 | |
Box 14, Folder 11 | 1977, April to November, NRC re. Cooling Tunnels, Alternate Sites | |
Box 15 | ||
Box 15, Folder 1 | 1977, February 17, Staff Reply to NECNP Brief | |
Box 15, Folder 2 | 1977, February, NRC, GAO Investigation of Seabrook | |
Box 15, Folder 3 | 1977, March to October, EPA Costle 'Yes' Decision, SAPL Motion for Stay | |
Box 15, Folder 4 | 1977, February to July, ASLAB | |
Box 15, Folder 5 | 1977, March 31, Appearances and Memorandum and Order | |
Box 15, Folder 6 | 1977, June, SAPL and EPA as Remanded by 1st. Circuit Court | |
Box 15, Folder 7 | 1977, July to December, ASLB | |
Box 15, Folder 8 | 1977, July, ASLAB | |
Box 15, Folder 9 | 1977, September, SAPL vs. Costle, 1st. Circuit Court | |
Box 15, Folder 10 | 1977, September, NRC to PSNH re. Physical Security at Plants | |
Box 15, Folder 11 | 1977, November, NRC to PSNH re Additional Information Needed Prior to Issuance of Operating License | |
Box 15, Folder 12 | [1977?], NECNP Response to Staff's Motion to Reopen the Record | |
Box 15, Folder 13 | 1978, January 16, Brief of Applicants in Opposition to Exceptions | |
Box 15, Folder 14 | 1978, January to April, Issues with the NRC |
Series 4: Operating License Issues 50-443-OL, 50-444-OL, 1969-1986
(38 Boxes)Subseries A: On-site Issues
Box 1 | ||
---|---|---|
Box 1, Folder 1 | 1978, February to March, SAPL Cases before the 1st. Circuit Court of Appeals | |
Box 1, Folder 2 | 1978, February to April, 5APL before the ASLAB | |
Box 1, Folder 3 | 1978, April 28, SAPL before the ASLAB | |
Box 1, Folder 4 | 1978, May to June, Issues with the NRC | |
Box 1, Folder 5 | 1978, May to June, SAPL vs. Costle (EPA), 1st. Circuit Court of Appeals | |
Box 1, Folder 6 | 1978, June to November, SAPL before the ASLAB | |
Box 1, Folder 7-9 | 1978, July, Correspondence to Costle (EPA) re. Cooling Tunnels | |
Box 1, Folder 10 | 1978, July to September, Issues with the NRC | |
Box 2 | ||
Box 2, Folder 1 | 1979, January to April, Miscellaneous $, Assorted Financial PSNH | |
Box 2, Folder 2 | 1979, May, SAPL vs. NRC, 1st. Circuit Court of Appeals | |
Box 2, Folder 3-4 | 1979, May, "Safety and Relief Valves for PSNH", Seismic Calculations | |
Box 2, Folder 5-8 | 1979-1981, NRC Show Cause Order, Evacuation/Class 9 (started 6/2/79), includes support material | |
Box 2, Folder 9 | 1979, September, Permittee's Response to Motion to Suspend Construction, re. Seismic Concerns | |
Box 2, Folder 10 | 1979, House Bill 671, To Prevent Siting of a Nuclear Plant in a Town without a Vote | |
Box 2, Folder 11 | 1979, House Bill 779, re Siting of Nuclear Facilities | |
Box 2, Folder 12 | 1980, November 18, Response to NRC Staff in Opposition to Motion to Suspend Construction | |
Box 2, Folder 13 | 1980, September to December, ASLAB, re Adequacy of Seismic Calculations vis a vis Seabrook | |
Box 2, Folder 14 | 1981, June to July, Newsclips Evacuation Show Cause Order | |
Box 2, Folder 15 | 1982, January, Proposed Rule on Environmental Qualification of Electrical Equipment | |
Box 2, Folder 16 | 1984, January, Results of In-Progress Audit of Seabrook Station Detailed Control Room Design Review | |
Box 2, Folder 17-19 | 1984, March to August, Financial Qualifications as Requirement for OL | |
Box 3 | ||
Box 3, Folder 1 | 1984-1986, NECNP IB.2, Safety and On-Site Emergency Planning Issues 5/84 to 9/86 | |
Box 3, Folder 2-3 | 1985-1986, NRC Staff Status Reports , On-Site Emergency Planning, 10/85 to 9/86, 1 of 2 | |
Box 3, Folder 4 | 1986, March to June, Integrated Design Inspection Report | |
Box 3, Folder 5 | 1986, April to June, Integrated Design Inspection Report | |
Box 3, Folder 6-9 | 1986, July, Contention NH 10, SAPL supp.6, re Control Room Design [SAPL took over the contention of NH in July 1986 after the State dropped it] | |
Box 4 | ||
Box 4, Folder 1 | Contention NH 10, SAPL supp.6, Pt.II, 4/83 to 6/86 | |
Box 4, Folder 2 | Contention NH 10, SAPL supp.6, Pt.II, 7/86 to 8/8/86 | |
Box 4, Folder 3 | Contention NH 10, SAPL supp.6, Pt.II, 8/18/86 to 9/17/86 | |
Box 4, Folder 4 | 1986, Work Papers, SPDS Issues re SAPL actions Vis a Vis NH Contention 10 | |
Box 4, Folder 5-16 | 1986, September 26, Draft SAPL supp.6. Hearings of Advisory Committee on Reactor Safeguards Subcommittee on Severe Accidents and Subcommittee on Occupational and Environmental Protection Systems | |
Box 4, Folder 17 | 1986, October, SAPL Brief and Other Material re On-Site Issues | |
Box 5 | ||
Box 5, Folder 1 | 1987, April, Suggestion of Mootness, On Site Emergency Planning and Technical Issues | |
Box 5, Folder 2-3 | 1987-1988, On-Site Emergency Planning, NECNP Pleadings re Coaxial Cable, 2 of 2, 11/87 to 5/88 | |
Box 5, Folder 4-9 | 1987-1988, NECNP and Steam Generator and Bio-Fouling On-Site Issues, 11/20/87 to 1/7/88) | |
Box 5, Folder 10 | 1988-1989, On-Site Emergency Planning[1/88-7/89] | |
Box 5, Folder 11 | 1989, January 23, NRC Staff Response to Joint Intervenors' Motions for reconsideration of CLI-88-lQ | |
Box 5, Folder 12 | 1989, March 15, NRC Staff Response in opposition to Joint Intervenor's Appeal of LBP-89-09 | |
Box 5, Folder 13 | 1989, May 11, NRC Staff Response to Intervenors' Motions for a Stay of Low Power Operation Pending Commission of Appellate Review | |
Box 5, Folder 14 | 1989, May 24, NRC Staff Response to Intervenors' Motion for Reconsideration of CLI-89-08 and Renewed Motion for Stay of Issuance of Low Power License | |
Box 5, Folder 15 | (?) Safety and Relief Valves for PSNH", 2nd. Proposal Rough Draft | |
Box 5, Folder 16 | NRC Staff Testimony on Alternative Sites before the ASLB | |
Box 6 | ||
Box 6, Folder 1 | Applicant's Direct Testimony, #6, before the ASLB, re Compliance with 10 CFR 100 | |
Box 6, Folder 2 | Applicant's Direct Testimony, #9, before the ASLB, re Effects on Commercial and Sport Fishing | |
Box 6, Folder 3 | Applicant's Direct Testimony, #10, before the ASLB, re Effects of Construction and Operation on Clam Flats and Clam Populations | |
Box 6, Folder 4 | Applicant's Direct Testimony, #13, before the ALSB, re Decommissioning | |
Box 6, Folder 5 | Applicant's Direct Testimony, #23, before the ASLB, re Energy and Peak Local Forecasts and Generating Capacity requirements | |
Box 6, Folder 6 | Applicant's Direct Testimony, #26, before the ASLB, re NE Utility's Press Releases | |
Box 6, Folder 7 | SAPL Direct Testimony on Need for Power, before the ASLB |
Subseries B: Off-site Issues
- Hearings of the NRC (primarily the ASLB) (B. 6 f. 8-B. 20 f. 18)
- New Hampshire Off-Site Emergency Preparations and Miscellany (B. 21 f. 1-B. 22 f. 8)
- Massachusetts Off-Site Emergency Preparations (B. 22 f. 9-B. 23 f. 3)
- Other Government Bodies Involved in Emergency Preparation Issues: Congress, Courts, FEMA, NRC, Miscellaneous Goverment Groups (B. 23 f. 4-B. 27 f. 10)
- Miscellaneous Subject Files, re: Emergency Planning (B. 27 f. 11-B. 31 f. 10)
Box 6, Folder 8 | 1981-1982, Meeting at NRC, Environmental Review Team, 12/2/81, Meetings 5/21/82 | |
Box 6, Folder 9 | 1981, July 15, Denton's Decision re Emergency Planning | |
Box 6, Folder 10 | 1982, May 6 and 7, 1st. Prehearing Conference | |
Box 6, Folder 11 | 1982, July, 2nd. Prehearing Conference | |
Box 6, Folder 12-13 | 1982, July, Response to [Inquiries][RAD?](Emergency Preparedness Licensing[?] | |
Box 6, Folder 14 | 1982, July to December, Risk Study, Richard, Lowe and Garrick, Einal Environmental Analysis | |
Box 6, Folder 15 | 1982, September 13, Memorandum and Order | |
Box 6, Folder 16-18 | 1982-1983, NECNP Contentions, 10/82 to 7/83 | |
Box 7 | ||
---|---|---|
Box 7, Folder 1 | 1982-1983, NECNP Contentions | |
Box 7, Folder 2 | 1982, November 17, Memorandum and Order Addressing Intervenor's Motions for Reconsideration of the Board's Prehearing Conference Order and Motions for Certification | |
Box 7, Folder 3 | 1982-1983, NH State Interrogatories and PSNH Replies | |
Box 7, Folder 4-6 | 1982-1983, Interested Towns Under 2.715 of the Code of Federal Regulations, 11/82 to 5/83 | |
Box 7, Folder 7 | 1982-1983, ASLB Board Orders, 11/82 to 8/83 | |
Box 7, Folder 8 | 1983, January 10, Newburyport Plan(Draft) | |
Box 7, Folder 9 | 1983-1986, Reactor Pressure Vessel Indication, supp. cont.7, 2/83 to 5/86 | |
Box 7, Folder 10 | 1983, March, Safety Evaluation Report | |
Box 7, Folder 11-12 | 1983, March, SAPL Supplement 3, Class 9 Accident and Consequences and Summary Disposition Motion | |
Box 8 | ||
Box 8, Folder 1 | 1983, March, SAPL Supplement 3... | |
Box 8, Folder 2 | 1983, March, Correspondence from Herb Moyer | |
Box 8, Folder 3-6 | 1983, March to September, Actions of Mass. Attorney General's Office re RERP | |
Box 8, Folder 7 | 1983, April 7 and 8, 3rd. Prehearing Conference | |
Box 8, Folder 8 | 1983, May 3, SAPL's Supplemental Responses to Applicant's Interrogatories and Request for Production of Documents | |
Box 8, Folder 9 | 1983, June to July, Appeal Board | |
Box 8, Folder 10-12 | 1983, July to August, Hearings re Evacuation Time Estimates, NECP III12 and III13 | |
Box 8, Folder 13 | 1983-1986, Control room Design Audit, 7/83 to 2/86 | |
Box 8, Folder 14 | 1983, September 29, Discovery on Emergency Plans | |
Box 8, Folder 15 | 1983-1984, Motion to Dismiss Unit II's OL Application, 10/83 to 3/84 | |
Box 9 | ||
Box 9, Folder 1 | 1983, August, Newsclips, 1st. Phase ASLB Hearings, Seabrook OL | |
Box 9, Folder 2-4 | 1983, August, Emergency Planning I, Documents before August 1983 Hearings | |
Box 9, Folder 5-7 | 1983, August to September, Emergency Planning II, filings Subsequent to Aug. 1983 Hearings through Sept., Contentions of So.Hampton, Rensington, Hampton Falls, Rye | |
Box 9, Folder 8-12 | Emergency Planning III | |
Box 10 | ||
Box 10, Folder 1 | Emergency Planning III | |
Box 10, Folder 2-3 | 1983, Markowitz Affidavit | |
Box 10, Folder 4 | 1984, December, ETE Rebuttal | |
Box 10, Folder 5 | 1985-1987, Maine Attorney General re Qff-Site EP, 3/85 to 10/87 | |
Box 10, Folder 6 | 1985-1986, Applicant's Material re Off-Site EP Issues, 6/85 to 10/86 | |
Box 10, Folder 7 | 1985-1986, Testimony re NECNP EQ Contention(I.B.2), 10/85 to 9/86 | |
Box 11 | ||
Box 11, Folder 1 | 1985-1986, Massachusetts' Actions re Emergency Response Planning, 11/19/85 to 2/21/86 | |
Box 11, Folder 2 | 1986, January to May, SAPL's Supplemental Reply to Applicant's Interrogatories | |
Box 11, Folder 3 | 1986-1987, Rye re Off-Site EP, 1/86 to 11/87 | |
Box 11, Folder 4 | 1986, February to June, South Hampton re Off-Site EP | |
Box 11, Folder 5 | 1986, February to October, Kensington re Off-Site EP | |
Box 11, Folder 6-7 | 1986, February to December, SAPL's Contentions on NHRERP | |
Box 11, Folder 8 | 1986-1987, Board Correspondence re Off-Site EP, 2/86 to 12/87 | |
Box 11, Folder 9-11 | 1986-1987, NECNP re Seabrook Operating License, 2/24/86 to 5/14/86 | |
Box 12 | ||
Box 12, Folder 1-5 | 1986-1987, NECNP..., 11/12/86 to 12/4/86 | |
Box 12, Folder 6 | 1986, March to November, State of New Hampshire, re EP and Off-Site Issues | |
Box 12, Folder 7-9 | 1986-1987, Applicant's Motion for Summary Disposition re SAPL Contentions During Hearings on Off-Site EP Issues, 3/86 to 7/87 | |
Box 12, Folder 10 | 1986, March, Merrimack, NH re Off-Site EP | |
Box 12, Folder 11 | 1986, March 24 to May 15, Massachusetts' Actions re RERP | |
Box 12, Folder 12 | 1986-1987, SAPL's Contentions re Off-Site Emergency Prep, 3/86 to 3/8 | |
Box 13 | ||
Box 13, Folder 1-3 | 1986-1987, SAPL's Contentions... | |
Box 13, Folder 4 | 1986, Exeter re Off-Site EP, 4/86 to 5/86 | |
Box 13, Folder 5 | 1986, April, SAPL's Interrogatories and Documents Requests, State of NH | |
Box 13, Folder 6 | 1986, April to June, State of New Hampshire Interrogatories and Answers | |
Box 13, Folder 7 | 1986, April to July, Draft License, etc | |
Box 13, Folder 8 | 1986-1987, EPZ Reduction, 4/86 to 4/87 | |
Box 13, Folder 9 | 1986, May 14, State's response to NECNP's Interrogatories and Requests for Docs | |
Box 13, Folder 10 | 1986, May 15, SAPL's 4th. Supplemental Petition for Leave to Intervene | |
Box 13, Folder 11 | 1986, May 21 to July 10, Massachusetts' actions re ERP | |
Box 13, Folder 12-13 | 1986, May, Motions for Sum. Dismissal by PSNH | |
Box 14 | ||
Box 14, Folder 1 | 1986, May, Off-Site Emergency Planning Issues, Affidavits | |
Box 14, Folder 2 | 1986, May, Off-Site Emergency Planning Issues, Affidavits | |
Box 14, Folder 3 | 1986, May, Off-Site Emergency Planning Issues, Motions for Summary Disposition | |
Box 14, Folder 4 | 1986, June 27, SAPL Response and Objection to PSNH Pursuit of Low Power OL | |
Box 14, Folder 5 | 1986-1987, Hampton Falls, NH re Off-Site Ep, 6/86 to 11/87 | |
Box 14, Folder 6 | 1986-1987, Town of Amesbury, MA, Emergency Response Plans and ASLB, 7/86 to 11/87 | |
Box 14, Folder 7 | 1986, August 15 to December 30, MA. Actions re ERP | |
Box 14, Folder 8-13 | 1986-1988, Letters to Board(ASLB), 9/86 to 4/88 | |
Box 14, Folder 14 | 1986-1988, Sept to Oct, Seabrook(Town of) re Off-Site EP | |
Box 14, Folder 15 | 1986-1987, Commonwealth of Massachusetts response to Zone Reduction Plan, ERP, 10/86 to 1/87 | |
Box 15 | ||
Box 15, Folder 1 | 1986-1987, MA. Response to Zone Reduction Plan | |
Box 15, Folder 2-3 | 1986-1987, O% License Appeal, 10/86 to 1/87 | |
Box 15, Folder 4 | 1986-1987, State of New Hampshire, re Emergency Planning and Off-Site Issues, 12/86 to 10/87 | |
Box 15, Folder 5 | 1986-1987, MA. Actions re ERP, 12/30/86 to 3/25/87 | |
Box 15, Folder 6 | 1986, Miscellaneous re Off-Site Emergency Planning and Safety Issues | |
Box 15, Folder 7 | 1987, January 16, Excerpt of Transcript from LEA's Contentions as an Intervenor at Limerick | |
Box 15, Folder 8 | 1987, January, Phillips Exeter Academy re Reduction of EPZ | |
Box 15, Folder 9 | 1987-1988, January, ASLB Hearing Notes | |
Box 15, Folder 10 | 1987, March 30 to April 15, MA. Actions re ERP | |
Box 15, Folder 11 | 1987, March to June, Miscellaneous Material Dealing with Off-Site Emergency Prep before NRC | |
Box 16 | ||
Box 16, Folder 1 | 1987, April 27 to June 15, MA. Actions re ERP | |
Box 16, Folder 2 | 1987, April, Affidavits | |
Box 16, Folder 3 | 1987-1988, Testimony and Notes re Seabrook Area Traffic and Off-Site Emergency Planning Hearings, 4/87 to 1/88 | |
Box 16, Folder 4-5 | 1987, May 7, Information re KLD Survey to SAPL from MA. A.G. | |
Box 16, Folder 6-7 | 1987, May to Sept, Off-Site EP | |
Box 16, Folder 8 | 1987, May to Dec, SAPL re Off-Site Emergency Planning | |
Box 16, Folder 9 | 1987, June 11, Mileti Deposition, pp.l-60 | |
Box 16, Folder 10 | 1987, June 11, Mileti Deposition, pp.61-126 | |
Box 16, Folder 11 | 1987, June 11, Mileti Deposition. pp.127-end | |
Box 16, Folder 12 | 1987, June 29 to November, Mass Actions re ERP | |
Box 16, Folder 13 | 1987, June to July, Applicant's Discovery re Off-Site Emergency Planning | |
Box 17 | ||
Box 17, Folder 1-3 | 1987-1988, Utility Plan re Submission of MA. Plan (SPMC), Vacation of Stay, 7/87 to 2/88 | |
Box 17, Folder 4 | 1987, September 11, Testimony of David P. MacDonald for SAPL re SAPL Contentions 8 and 8a Relative to the Town of Rye | |
Box 17, Folder 5 | 1987, September 14, Testimony of Avishai Ceder, Off-Site Emergency Prep | |
Box 17, Folder 6 | 1987, September 14, Testimony of Thomas J. Adler, Off-Site Emergency Prep | |
Box 17, Folder 7 | 1987, September 14, Testimony of Colin High, Thomas J. Adler and William A. Befort, Off-Site Emergency Prep | |
Box 17, Folder 8-9 | 1987, September 14, Testimony of Dr. Albert Luloff on Behalf of James Shannon, MA. A.G., re Off-Site EP | |
Box 17, Folder 10 | 1987, September 14, Testimony of Donald J. Zeigler, James H. Johnson Jr., and Stephen Cole on behalf of the MA. A.G. | |
Box 18 | ||
Box 18, Folder 1 | 1987, September 14, Test. of Zeigler et al.. | |
Box 18, Folder 2 | 1987, September 14, Testimony of Steven Sholly on the Technical Basis for NRC E.P. Rules, etc... | |
Box 18, Folder 3 | 1987, September 14, Attachments to the Testimony of Steven C. Sholly | |
Box 18, Folder 4 | 1987, September, Off-Site EP Issues, Prefiled Testimony | |
Box 18, Folder 5 | 1987, September, Testimony of Dr. Thomas Urbanik II on Behalf of the NRC Staff on Town of Hampton Contention III and SAPL Contentions 18, 31, 34 and 37 | |
Box 18, Folder 6 | 1987-1988, re Atty. General Shannon and hearings on NHRERP, 9/87 to 2/88 | |
Box 18, Folder 7-9 | 1987-1988, Sheltering Issues, 9/87 to 3/88 | |
Box 18, Folder 10 | 1987-1988, October, PSNH Testimony on Notification/Communications in Evacuation Plans | |
Box 18, Folder 11 | 1987-1988, Proposed Findings for SAPL Contentions before the ASLAB, 10/87 to 2/88 | |
Box 18, Folder 12 | 1987, October, Testimony of Daniel Trahan on Behalf of Town of Hampton and SAPL Regarding Town of Hampton Revised Contentions III, IV and V and SAPL Contentions 16, 25 | |
Box 18, Folder 13 | 1987, December 14, Documents re Testimony of Dr. Albert Luloff for A.G. of MA | |
Box 19 | ||
Box 19, Folder 1-2 | 1988, January 7, MA. Actions re ERP. | |
Box 19, Folder 3 | 1988, January 11 to March 18, MA. Actions re ERP. | |
Box 19, Folder 4 | 1988, January 12, Hearings Before ASLB, Off-Site Emergency Planning Evidentiary Hearings | |
Box 19, Folder 5-7 | 1988-1989, Scheduling Pleadings, SPMC Litigation, 2/88 to 2/89 | |
Box 19, Folder 8 | 1988, April 7 to May 2, MA. Actions re ERP | |
Box 19, Folder 9 | 1988, June 30 to July 6, MA. Actions re ERP | |
Box 19, Folder 10 | 1988, July 7, MA. Actions re ERP | |
Box 20 | ||
Box 20, Folder 1 | 1988, July 20 to October 19, MA. Actions re ERP | |
Box 20, Folder 2 | 1988, November, Meeting with PSNH re Low Power License | |
Box 20, Folder 3 | 1989, February, Commission Target Data, FOIA Request in re Target Schedule for Final Initial Decision in PSNH et al | |
Box 20, Folder 4-5 | 1989, March 1, Mass. Actions re ERP | |
Box 20, Folder 6 | 1989, March 7 to 17, NRC Staff's Pre-trial brief on Contentions Concerning the Seabrook Plan for MA. Communities (SPMC) and Supplemental Requests | |
Box 20, Folder 7 | 1989, March 16 to May 16, Mass Actions re ERP | |
Box 20, Folder 8 | 1989, March 17, NRC Staff Motion for Leave to File Out of Time | |
Box 20, Folder 9 | 1989, March 17, NRC Staff's Opposition to MA. AG's Motion for Directed Certification Qf LBP-89-8 | |
Box 20, Folder 10 | 1989, April 3, Letter from Flynn, Ass. General Council to FEMA, to ASLB re PSNH et al | |
Box 20, Folder 11 | 1989, April 17, NRC Staff Motion to Strike Intervenor's Notices of Appeal of LBP-89-10 | |
Box 20, Folder 12 | 1989, May 8, Letter with Enclosures from We the People to Samuel Chilk, Secretary NRC | |
Box 20, Folder 13 | 1989, May 11, MA. AG's Opposition to Applicant's Motion to Dismiss Joint Intervenor Contentions | |
Box 20, Folder 14 | 1989, May 16 to 31, MA. Actions re ERP | |
Box 20, Folder 15 | 1984, May 21, Declaration of Vernon E. Adler before the ASLB re PSNH et al | |
Box 20, Folder 16 | 1989, May 22, NRC Staff's Response to MA. AG's Motion for Directed Classification of the Licensing Board's Oral Ruling Dismissing Contention l9(D) | |
Box 20, Folder 17 | 1989, June 12 to July 17, MA. Actions re ERP | |
Box 20, Folder 18 | 1989, September 25, Emergency Exercise Objective and Scenario Guidelines for Exercise Schedule | |
Box 21 | ||
Box 21, Folder 1 | 1981-1986, Civil Defense Meetings, Letters, etc, 6/81 to 2/86 | |
Box 21, Folder 2 | 1982-1983, Local Plan Review, 10/82 to 10/83 | |
Box 21, Folder 3 | 1982-1984, Seacoast Evacuation, 11/82 to 2/84 | |
Box 21, Folder 4 | 1983, February to March, Chamber of Commerce, Hampton Beach Area, Before the NRC | |
Box 21, Folder 5 | [1984], Exeter Citizens Concerned About Evacuation Planning | |
Box 21, Folder 6 | 1985, April to November, Newsclips on Evacuation | |
Box 21, Folder 7 | 1985, May to October, Town Councilors, letter to, re Evacuation | |
Box 21, Folder 8 | 1985-1986, Citizen's Meeting re Emergency Planning, 10/85 to 4/86 | |
Box 21, Folder 9 | 1986, January, revision 1 of NHRERP | |
Box 21, Folder 10 | 1986, March to April, Town Meetings and Nuclear Dump Resolution | |
Box 21, Folder 11 | 1986-1987, League of Towns, 6/86 to 3/87 | |
Box 21, Folder 12 | 1986, November 10, R.L. Kaufmann's Comments on NHRERP | |
Box 21, Folder 13 | 1986-1987, Strategy Meeting re Seabrook Interventions, 12/86 to 6/87 | |
Box 21, Folder 14 | 1986-1988, Correspondence re NHRERP (not SAPL originated) | |
Box 21, Folder 15 | 1987, State Legislation | |
Box 21, Folder 16 | 1988, June 28, Miscellaneous Evacuation | |
Box 21, Folder 17-20 | 1988, November 28, Update of NHRERP | |
Box 22 | ||
Box 22, Folder 1 | 1988, November 28, Update of NHRERP | |
Box 22, Folder 2 | Data from Plans, Rev.0, re Off-Site Emergency Plans | |
Box 22, Folder 3 | Data from Plans, Rev.2 | |
Box 22, Folder 4 | Notebook, Notes on Rev.2 RERP | |
Box 22, Folder 5 | Notes re RERP | |
Box 22, Folder 6 | State of New Hampshire Radiological Emergency Response Plan | |
Box 22, Folder 7 | Town Plan Contention Notes | |
Box 22, Folder 8 | Warrant Articles re Evacuation | |
Box 22, Folder 9-11 | 1985-1986, Massachusetts Evacuation Plans, 1/85 to 11/86 | |
Box 22, Folder 12 | [1985], MA. A.G.'s Letter to Towns | |
Box 22, Folder 13 | 1985, June to August, MMWEC Report, Section on Emergency Planning | |
Box 22, Folder 14 | 1986, January 10, Evacuation Plan Update for Seabrook Station, Progress Report 3, Produced by KLD and Associates for the State of Massachusetts | |
Box 22, Folder 15 | 1986, January 18, Evac Plan Update, Progress Report 4 | |
Box 22, Folder 16 | 1986, February 18, Evac Plan Update, Progress Report 5 | |
Box 22, Folder 17 | 1986, April, Evac Plan Update, ETE by KLD, Progress Report 6 and final | |
Box 23 | ||
Box 23, Folder 1 | 1986, April, Evacuation Plan Update, Progress Report 7 for MA. CDA and OEP | |
Box 23, Folder 2 | Notes on KLD Evac Time Estimates and Reports in their Progress in Making Them | |
Box 23, Folder 3 | KLD Survey of Seabrook Area | |
Box 23, Folder 4 | 1981, Congressional Committees | |
Box 23, Folder 5 | 1982, November to December, Sandia Report (NUREG/CR 2239), Technical Consequences for Siting Criteria Development and Dangers of Meltdown | |
Box 23, Folder 6 | 1983, June to November, Licensing "Reform" Legislation | |
Box 23, Folder 7 | 1983-1984, Temporary Operating License Legislation | |
Box 23, Folder 8 | 1983, Senator Simpson Weakens Emergency Planning Regs | |
Box 23, Folder 9 | 1983-1984, Simpson's 2nd. Onslaught on Emergency Planning | |
Box 23, Folder 10 | 1986, October 10, ACRS(Advisory Committee on Reactor Safeguards) Hearings | |
Box 23, Folder 11 | 1986, "Licensing Reform" | |
Box 23, Folder 12-14 | 1986-1987, Price-Anderson Act | |
Box 24 | ||
Box 24, Folder 1 | 1987, Congressional Legislation | |
Box 24, Folder 2 | 1987-1988, Humphrey, Gordon, re Emergency Planning, 1/87 to 12/88 | |
Box 24, Folder 3 | 1988, NRC "Reform" Bill | |
Box 24, Folder 4 | 1981, DC Circuit Court of Appeal, 81-2146 | |
Box 24, Folder 5 | 1983, Supreme Court Ruling on California Moratorium | |
Box 24, Folder 6 | 19881986, August, Suit v. NRC re Training for Nuclear Plant Workers, sect. 306 of NWPA. | |
Box 24, Folder 7 | 19881986, Decommissioning Suit Hearings, Cushing v. Sununu et al | |
Box 24, Folder 8 | 19881987, February, Motion for Partial Summary Judgement in Hampton v. State et al | |
Box 24, Folder 9 | Nuclear Litigation, Legal Precedents, Notes | |
Box 24, Folder 10 | 1980, January to October, SAPL-FEMA | |
Box 24, Folder 11 | 1980, Seabrook Station Evacuation Analysis Prepared for FEMA | |
Box 24, Folder 12 | 1985-1986, Pressure on FEMA, 3/85 to 6/86 | |
Box 24, Folder 13 | 1986, February to June, FEMA Graded Exercises for Emergency Evacuation | |
Box 24, Folder 14 | 1988, January to October, Memorandum re Review of Seabrook Plan for Massachusetts Communities | |
Box 24, Folder 15 | 1988, October, Review and Evaluation of Seabrook Plan for MA. Communities | |
Box 24, Folder 16 | 1988, November 22, Response of FEMA to Town of Amesbury's First Set of Interrogatories and Request for Production of Documents to FEMA on Seabrook Plan for Massachusetts Communities | |
Box 24, Folder 17 | 1988, December 9, Reply by FEMA to the Mass A.G.'s Motion to Compel Response by FEMA to Interrogatories and Requests for Production of Documents | |
Box 24, Folder 18 | 1988, December 14, Letter to Victor Stello, NRC, from FEMA | |
Box 24, Folder 19 | 1988, December, FEMA Region 1, Report of the Public Meeting for the Seabrook Nuclear Power Station Held on July 2, 1988 | |
Box 25 | ||
Box 25, Folder 1 | 1988, December, Raviaw of the State of New Hampshire RERP for Seabrook Station, FEMA | |
Box 25, Folder 2 | 1988, December, Findings and Determinations Seabrook Nuclear Power Station | |
Box 25, Folder 3 | 1988, December, Review and Evaluation of the Seahrook Plan for MA. Communities | |
Box 25, Folder 4 | 1988, December, Review and Evaluation of the State of Maine Ingestion Pathway Plan for Seabrook Station | |
Box 25, Folder 5 | 1988, December, Status of Corrective Actions for the 1988 FEMA Graded Exercises for Seabrook Station | |
Box 25, Folder 6 | 1989, January 5, Letter to Brown, PSNH, re FEMA Consolidated Report on Seabrook Off-Site Planning and Preparedness | |
Box 25, Folder 7 | 1989, January 6, Certificate of Service | |
Box 25, Folder 8 | 1989, January 9, FEMA's Qpposition to Mass A.G.'s Motion to Compel and Supplemental Responses, etc | |
Box 25, Folder 9 | 1989, April 7, Forwarding of FEMA Findings on the Maine Ingestion Pathway Plan | |
Box 25, Folder 10 | 1979, April 21, FEMA Reply to MA. A.G.'s Motion to Compel Production of Documents from FEMA | |
Box 25, Folder 11 | Info Sheet re FEMA Drill | |
Box 25, Folder 12 | 1975-1980, NRC Evacuation Guides (Emergency Response Planning) | |
Box 25, Folder 13-15 | 1981-1983, NRC Safety Goals, 7/81 to 7/8 | |
Box 25, Folder 16 | 1981, November 23, NRC CRAC/COMO | |
Box 26 | ||
Box 26, Folder 1 | 1981, November 23, NRC CRAC/COMO | |
Box 26, Folder 2 | 1981, May to August, NRC Proposed Rule Changeswith SAPL Annotations | |
Box 26, Folder 3 | 1981, December 15, Proposed NRC Rule Changes on Emergency Planning | |
Box 26, Folder 4-5 | 1982, January to November, Risk Analysis | |
Box 26, Folder 6 | 1982-1984, Probabilistic Risk Assessment, 1/82 to 2/84 | |
Box 26, Folder 7 | 1982, Need for Power, NRC | |
Box 26, Folder 8 | 1983, January to November, ACRS Hearing, April 1 and 2, 1983 | |
Box 26, Folder 9 | 1983, August, NRC Hearings | |
Box 27 | ||
Box 27, Folder 1 | 1984, July to September, Asseltine's Tour of Seabrook | |
Box 27, Folder 2 | 1984, September to December, NRC Severe Accident Policy | |
Box 27, Folder 3 | 1984, Environmental Qualifications of Electrical Equipment | |
Box 27, Folder 4 | 1984-1985, Source Terms | |
Box 27, Folder 5 | 1986-1987, FOIA Request for Information Dealing with Dose Calculations, 4/86 to 4/87 | |
Box 27, Folder 6 | 1986, October, NRC Staff Draft Testimony for Congressional Hearing on Seabrook | |
Box 27, Folder 7 | 1986, October to December, NRC Correspondence re Worker's Allegations | |
Box 27, Folder 8 | 1986, NRC Litigation, "Next Round" | |
Box 27, Folder 9 | 1977, April 27, Newington Testimonies before the EPA re Atlantic Terminals Corporation | |
Box 27, Folder 10 | 1987, Fairness Doctrine | |
Box 27, Folder 11 | 1981, Academic Articles re Evacuation and Emergency Planning | |
Box 27, Folder 12 | 1983, April, "An Argument Versus Current Nuclear Power Generation Based on the Experiences of an Engineer," Markowitz, George T | |
Box 27, Folder 13 | 1982, August 19, Catawba-ASLAB-687 | |
Box 27, Folder 14 | 1986, Comments on NHRERP by Ronald Kaufmann | |
Box 27, Folder 15 | Directory of Environmental Groups in New England | |
Box 27, Folder 16 | 1986, October, Drug and Alcohol Abuse at Seabrook | |
Box 28 | ||
Box 28, Folder 1 | 1975, December, "The Economics of Nuclear Power: A New England Perspective" | |
Box 28, Folder 2-4 | 1986-1987, EPZ Reduction Effort by New Hampshire Yankee, 7/86 to 3/87 | |
Box 28, Folder 5 | 1983-1983, Emergency Workers, 6/82 to 3/83 | |
Box 28, Folder 6-8 | 1980-1981, Evacuation Information | |
Box 28, Folder 9-11 | Evacuation Time Study, E.T.E. | |
Box 28, Folder 12 | 1982, October, "Further Analysis and Interpretation of the Shoreham Evacuation Plan" | |
Box 28, Folder 13-14 | 1975-1980, General Evac. Plans (Not NRC Guides) | |
Box 29 | ||
Box 29, Folder 1 | 1975-1980, General Evacuation Plans | |
Box 29, Folder 2 | Governor's Task Force on DOE's Crystalline Repository Project | |
Box 29, Folder 3-5 | 1983-1984, State Issues Committee, Greater Portsmouth Area Chamber of Commerce | |
Box 29, Folder 6 | 1984, Chamber Candidate's Breakfast | |
Box 29, Folder 7 | 1984-1985, Electric Rate Issue Subcommitte of the Greater Chamber of Commerce | |
Box 29, Folder 8 | 1986, Herb's Plan Critique Materials | |
Box 29, Folder 9 | 1981, HMM Reports | |
Box 29, Folder 10 | 1982, Independent Estimate of ETE for a Peak Population Scenario in the EPZ of Seabrook Nuclear Power Station, pp.i to iii-29 | |
Box 29, Folder 11 | 1982, Independent Estimate of ETE, pp.iv to figure 14 | |
Box 29, Folder 12 | 1982, Independent Estimate of ETE, pp.figure 15 to table 44 | |
Box 29, Folder 13 | 1982, Independent Estimate of ETE, pp.table 45 to table 54 | |
Box 29, Folder 14 | 1982, Independent Estimate of ETE, pp.table 55 to end | |
Box 29, Folder 15 | 1986, Miscellaneous Emergency Planning | |
Box 29, Folder 16 | 1985, Miscellaneous Emergency Prep, Evacuation Time Estimates | |
Box 30 | ||
Box 30, Folder 1 | 1986-1987, Miscellaneous Emergency Prep, Miscellaneous Material, 7/86 to 3/87 | |
Box 30, Folder 2 | 1986-1987, Miscellaneous Emergency Prep, Sheltering Issues, 3/86 to 2/87 | |
Box 30, Folder 3 | 1986-1987, Miscellaneous Emergency Prep, Traffic Issues, 7/86 to 8/87 | |
Box 30, Folder 4 | 1986-1987, Miscellaneous Emergency Prep, Training, 3/86 to 3/87 | |
Box 30, Folder 5 | 1982-1987, Miscellaneous Emergency Prep, Health and Medical Preparation, 4/82 to 3/87 | |
Box 30, Folder 6 | 1982 to 1983, Misecellaneous, Related to Seabrook Operating License, 4/84 to 5/83 | |
Box 30, Folder 7 | 1986, January to March, Non-SAPL, News Releases and Letters to the Editor | |
Box 30, Folder 8 | 1988, October 20, Notes from Deposition of George Gram | |
Box 30, Folder 9 | 1988, November 1, Notes from Deposition of Joseph Ellis | |
Box 30, Folder 10 | 1988, November 7, Notes from Deposition of Gilbert Cahill | |
Box 30, Folder 11 | 1988, November 10 and 11, Notes from Deposition of Richard W. Donovan | |
Box 30, Folder 12 | Nuclear Power and Psychology Related Matters | |
Box 30, Folder 13 | 1983, NRC Commissioners | |
Box 30, Folder 14 | Nuclear Waste in New Hampshire | |
Box 30, Folder 15 | Potassium Iodide | |
Box 30, Folder 16 | 1981-1983, Power Lines | |
Box 30, Folder 17 | PSCo Meeting Draft Copy on Evac Time Estimates | |
Box 31 | ||
Box 31, Folder 1 | "PSCo Evac Propaganda." | |
Box 31, Folder 2 | Radiological Monitoring in New Hampshire | |
Box 31, Folder 3 | Seabrook Unit II Delay | |
Box 31, Folder 4 | Seabrook Unit 2's Cancellation, Clippings | |
Box 31, Folder 5-7 | 1986, January, "The Source Term Debate," a Report by the Union of Concerned Scientists, (attachment 3 to the Affidavit of Gordon Thompson) | |
Box 31, Folder 8 | 1986, March, Special Transportation Needs | |
Box 31, Folder 9 | "Sununu's Whitewash Blue Ribbon Committee," To Review Post-Chernobyl Nuclear Safety Concerns | |
Box 31, Folder 10 | 1985, September to November, Three Mile Island Health Studies |
Subseries C: Financial Issues
Box 32 | ||
---|---|---|
Box 32, Folder 1 | 1980-1984, Seabrook Economics and Financing | |
Box 32, Folder 2 | 1981-1984, Stockholder Actions, 1/81 to 8/84 | |
Box 32, Folder 3 | 1981-1985, Sununu's and PUC Cost Statements and Proposals | |
Box 32, Folder 4 | 1981, July, PUC Peak Demand Investigation | |
Box 32, Folder 5 | 1981, November to December, PUC Testimony Rate Case, DE 81-304, (SAPL Testified 12/81) | |
Box 32, Folder 6 | l981-1982, DE 81-312, Supply and Demand of NH for Electricity regarding Seabrook II. Fall 1982 to 1983, (11/81 to 12/82) | |
Box 32, Folder 7 | 1982, February 2, United Nuclear Opponents Press Conference on Seabrook Finances | |
Box 32, Folder 8 | 1982, March 10, Attempt to Intervene Before PUC on PSNH's Request to Sell 3 Million Shares of Common Stock, DF82 63 SAPL Appealed Exclusion from Hearing to NH Supreme Court | |
Box 32, Folder 9 | 1982, June, PUC DF 82-141 Bona Fide Response from Other Utilities in Attempted Selldown | |
Box 32, Folder 10 | 1982, July 7, Press Conference with Richard Rosen | |
Box 32, Folder 11 | 1982-1984, PSNH's Bond Rating | |
Box 32, Folder 12 | 1983, January to December, Cost cap Intervention | |
Box 32, Folder 13 | 1983, March to April, PUC Commissioners and Appointments | |
Box 32, Folder 14 | 1983-1984, Construction Completion Dates, 3/83 to 3/84 | |
Box 32, Folder 15 | 1983, May to October, Joint Owners | |
Box 32, Folder 16 | 1983, July to October, Spirou on Seabrook | |
Box 32, Folder 17 | 1983, September, CAP Legislation | |
Box 32, Folder 18 | 1983, September to October, Bob's Press Conference on Sununu Charges | |
Box 32, Folder 19 | 1983, October 17, PSNH Rate Hike Request ($33 million, 9.45%) | |
Box 32, Folder 20 | 1983-1984, Rate Shocks, 10/83 to 10/84 | |
Box 33 | ||
Box 33, Folder 1 | 1983-1984, Seabrook Capital Costs, 12/83 to 3/84 | |
Box 33, Folder 2 | 1984, January to March, Town Warrant Article on Special Sessions | |
Box 33, Folder 3 | 1984, January to June, Donaldson, Lufkin and Jenrette | |
Box 33, Folder 4 | 1984, March, Jobs at Seabrook | |
Box 33, Folder 5 | 1984, March, Phantom Taxes | |
Box 33, Folder 6 | 1984, March to May, Palast's Study, "The Impact of Rising Electric Rates on the Economy of New Hampshire" | |
Box 33, Folder 7 | 1983-1984, Rate Shocks, 10/83 to 10/84 | |
Box 33, Folder 8 | 1984-1986, Timeline Df 84-200, 3/84 to 1/86 | |
Box 33, Folder 9 | 1984-1986, Appeal to New Hampshire Supreme Court, PUC Order in DF 84-200, June to Nov, 1985 | |
Box 33, Folder 10 | 1984-1986, Briefs Before the PUC re 84-200, Campaign for Ratepayer's Rights' Initial Brief, March 15, 1985 | |
Box 33, Folder 11 | 1984-1986, Briefs Before the PUC re Df 84-200, Brief on Behalf of SAPL | |
Box 33, Folder 12 | 1984-1986, Briefs Before the PUC re DF 84-200, Reply Brief on Behalf of SAPL | |
Box 33, Folder 13 | 1984-1986, Briefs Before the PUC re DF 84-200, Brief on Behalf of SAPL | |
Box 33, Folder 14 | 1984-1986, Briefing Miscellany for DF 84-200 | |
Box 33, Folder 15 | 1984-1986, Commission Orders, Df 84-200, April to September 1985 | |
Box 33, Folder 16 | 1984-1986, Cross Examination of Bruce Ellsworth | |
Box 33, Folder 17-18 | 1984-1986, Exhibits, DF 84-2Q0 | |
Box 34 | ||
Box 34, Folder 1 | 1984-1986, Exhibits re Prices | |
Box 34, Folder 2 | 1984-1986, Hearings on PSNH's Request for Lifting of Spending Restrictions of $5m wk., July 1985 | |
Box 34, Folder 3 | 1984-1986, Newsclips Bearing on DF 84-200 Case, 12/84 to 10/85 | |
Box 34, Folder 4 | 1984-1986, Notes Etc., DF 84-200, March 1984 to January 1985 | |
Box 34, Folder 5 | 1984-1986, Notes Etc., DF 84-200, November 1984 to February 1985 | |
Box 34, Folder 6 | 1984-1986, Price Projections, Nominal and RWH from Aeschliman's Dissent | |
Box 34, Folder 7 | 1984-1986, Public Utilities Commission Final Order, DF 84 200, April 18, 1985 | |
Box 34, Folder 8 | 1984-1986, Rosen's Testimony, DF 84-200 | |
Box 34, Folder 9-10 | 1984-1986, SAPL's Motions re DF 84-200, July to September 1985 | |
Box 34, Folder 11 | 1984-1986, Separate Opinion of Commissioner Aeschliman re 84-200 | |
Box 34, Folder 12 | PUC Finance Hearing, PSNH Seeks Authorization to Issue May 24, 1984, DR 84-121 | |
Box 35 | ||
Box 35, Folder 1 | PUC Finance Hearing | |
Box 35, Folder 2 | 1984, May to October, Newbrook, ("Newbroke") | |
Box 35, Folder 3 | 1984, June to July, Appeal of Roger Easton | |
Box 35, Folder 4 | 1984, June to August, Derivative and Class Action Suits | |
Box 35, Folder 5 | 1984, June to August, Derivative and Class Action Suits | |
Box 35, Folder 6-8 | 1984, June 24-25, Auth. to Borrow $425 Million, 84-168 Restructure of Agreements with Creditors | |
Box 35, Folder 9 | 1984, September, Touche-Ross | |
Box 35, Folder 10 | 1984, September, John N. Nassikas | |
Box 35, Folder 11 | 1984, September, PSNH's Petition for Original Jurisdiction | |
Box 35, Folder 12 | 1984-1985, Chapter 11 Option, 9/84 to 4/85 | |
Box 35, Folder 13 | 1984, October, MAC Report | |
Box 35, Folder 14 | 1984, November, SAPL II, Appeal of SAPL Before State Supreme Court, 84-502 | |
Box 35, Folder 15 | 1984, December 13, Maine PUC Order and NU Maine Co., etc | |
Box 36 | ||
Box 36, Folder 1 | 1984, February to November, PUC Hearing 83-398, Transfer of Question of RSA 378-50-A Interpretation to Supreme Court | |
Box 36, Folder 2-3 | 1984-1985, DF 83-360, Coop Case, 12/84 to 6/85 | |
Box 36, Folder 4 | 1984, Cavanagh's Papers | |
Box 36, Folder 5 | 1984, Regional Meetings | |
Box 36, Folder 6 | 1985, March 15, Briefs Before the PUC for DF 84-200, Trial Brief of PSNH | |
Box 36, Folder 7 | 1985, March to September, Anti-Trust Investigation | |
Box 36, Folder 8 | 1985, April, MA. DPU Decision in DPU 84-152 (Seabrook Generic Finance Case) | |
Box 36, Folder 9-10 | 1985, June, "Seabrook: An Evaluation," Report by MMWEC | |
Box 36, Folder 11 | 1985, September, Appeal of the Conservation Law Foundation, Inc. to State of NH Supreme Court | |
Box 37 | ||
Box 37, Folder 1 | 1985, September to November, Notes on Arguments to Supreme Court, FEMA Preliminary Review of NH Plans, Amesbury Meeting | |
Box 37, Folder 2 | 1985, November 8, Opinion of PUC After Remand | |
Box 37, Folder 3-4 | 1985-1987, PSNH Form 10k | |
Box 37, Folder 5 | 1986, January 31, Supreme Court Ruling, Appeal of Conservation Law Foundation | |
Box 37, Folder 6 | 1986, March 3, Appeal of McCool and Eastman re 85-139 | |
Box 37, Folder 7 | 1986, PSNH'a Avoided Cost Filing re SPP | |
Box 37, Folder 8 | Alternatives to Seabrook. Liscond Paper | |
Box 37, Folder 9-10 | CWIP, Construction Work in Progress | |
Box 37, Folder 11 | 1985, April, Gambit Report, "Is the NRC Licensing Unsafe Nuclear Power Plants?" | |
Box 37, Folder 12 | Lazar's Paper | |
Box 37, Folder 13 | Miscellaneous | |
Box 37, Folder 14 | Seabrook Investor, Central Maine Power | |
Box 37, Folder 15 | Seabrook Investor, Central Vermont Public Service | |
Box 38 | ||
Box 38, Folder 1 | Seabrook Investor, Connecticut Utilities | |
Box 38, Folder 2 | Seabrook Electric, Fitchburg Gas and Electric Co | |
Box 38, Folder 3 | Seabrook Investors, Massachusetts Municipal Wholesale Electric Company | |
Box 38, Folder 4 | Seabrook Investor, New England Power Company | |
Box 38, Folder 5 | Seabrook Investor, New Hampshire Electric Coop | |
Box 38, Folder 6 | Seabrook Investor, Vermont Electric Coop | |
Box 38, Folder 7 | Seabrook Investor, Vermont Public Service Board |
Series 5: Miscellaneous Seabrook Documents from Soruces Other than SAPL, 1974-1988
(1 Box)Box 1 | ||
---|---|---|
Box 1, Folder 1 | 1974, June, Evacuation Risks - An Evaluation | |
Box 1, Folder 2 | 1980, August, Seabrook Station Evacuation Analysis, Final Report | |
Box 1, Folder 3 | 1980, August, Seabrook Station Evacuation Analysis, Technical Memorandum #1 | |
Box 1, Folder 4 | 1981, November, Contract Between the New Hampshire Civil Defense Agency and Costello, Lomasney and deNapoli, Inc., Consulting Engineers To Develop a Radiological Emergency Response Plan for the Seabrook Nuclear Power Plant | |
Box 1, Folder 5 | 1984, January, Seabrook Station Public Alert and Notification System, Final Design Report | |
Box 1, Folder 6 | 1986, June, Final Exercise Assessment, Joint NH State and Local Radiological Emergency Response Exercise for the Seabrook Nuclear Power Plant | |
Box 1, Folder 7-10 | 1987, July, Risk Management Actions to Assure Containment Effectiveness at Seabrook Station | |
Box 1, Folder 11 | 1988, March 3, Comments of Mass. A.G. Shannon in Opposition to Nureg-0654/FEMA Rep. 1, Rev. 1, Supp.1, "Criteria for Utility Offsite Planning and Preparedness" |
Collection Content
- Series 1: Seacoast Anti-Pollution League History and Organization, 1970-1989
- Series 2: Preliminary Studies and Ecological Surveys Regarding Seabrook Nuclear Power Plant, 1969-1986
- Series 3: Seabrook Construction Licensing Issues, 1972-1978
- Series 4: Operating License Issues 50-443-OL, 50-444-OL, 1969-1986
- Series 5: Miscellaneous Seabrook Documents from Soruces Other than SAPL, 1974-1988