Seacoast Anti-Pollution League Papers, 1969-1989

Collection number: MC 136 [Stored Offsite]
Size: 74 boxes (24.66 cu.ft.)

About the Seacoast Anti-Pollution League

The Seacoast Anti-Pollution League (SAPL) was formed on March 29, 1969 in response to the Public Service Company of New Hampshire’s announcement of its intent to construct a nuclear power plant in Seabrook, New Hampshire. Although in response to the proposed plant, SAPL formulated its mission to encompass other seacoast New Hampshire environmental concerns. Even so, SAPL’s primary emphasis from inception through 1990 was on the Seabrook Plant.

From the time that PSNH began to survey the proposed location in Seabrook and to seek initial approval from state and federal government SAPL engaged in legal intervention to halt and/or hinder the process. Through these actions SAPL hampered the issuance of construction permits, forced changes in construction design in regards to the cooling tunnels of the plant, and sought various other changes in design to preserve the salt-marshes upon which the plant was built. As construction neared completion in the early 1980s SAPL’s emphasis shifted to concern about emergency preparedness and nuclear safety issues. It played a major role as intervenor in the various hearings before the NRC regarding issuance of an operating license to PSNH. Together with the Attorney General’s Office of Massachusetts and the New England Coalition on Nuclear Power, SAPL sought to prevent the issuance of an operating license on the grounds that the company’s and the state’s radiological emergency plans were inadequate for the assurance of public safety.

About the Seacoast Anti-Pollution League Papers

The Seacoast Anti-Pollution League Collection contains five series, primarily covering the years 1978 to 1989. Series 1 contains materials about the function and organization of SAPL and consists of office files, correspondence, financial materials, publications, and materials related to specific activities of the organization. These papers also reflect SAPL’s use of the court system to seek its ends where other intervention failed.

Series 2 contains reports analyzing safety and environmental concerns surrounding the construction and operation of the Seabrook Nuclear Power Plant, while Series 3 consists of materials relating to the issuance of a license for the construction of the plant. Series 4 comprises materials related to the fight over the issuance of an operating license. SAPL took an active role in seeking the denial of this license because of its concerns with emergency preparedness issues and nuclear safety. The papers in this series reflect SAPL’s emphasis on participation in the relevant hearings before the various boards of the NRC. Series 5 contains miscellaneous documents concerning the Seabrook Nuclear Power Plant from sources other than SAPL.

List of frequently used acronyms:

  • AEC: Atomic Energy Commission (forerunner of NRC); also seen as USAEC
  • ASLAB: Atomic Safety and Licensing Appeal Board of the NRC
  • ASLB: Atomic Safety and Licensing Board of the NRC
  • CWIP: Construction Work in progress
  • EPZ: Emergency Planning Zone
  • ETE: Evacuation Time Estimate
  • FOIA: Freedom of Information Act
  • MMWEC: Massachusetts Wholesale Municipal Electric Company
  • NECNP: New England Coalition on Nuclear Pollution
  • NHRERP: New Hampshire Radiological Emergency Response Plan
  • NRC: Nuclear Regulatory Agency
  • OL: Operating License
  • PSCo: Public Service Company
  • PSNH: Public Service of New Hampshire
  • PUC: Public Utilities Commission
  • RERP: Radiological Emergency Response Plan
  • SAPL: Seacoast Anti-Pollution League

Box numbering starts over with each of the 5 series. It is thus important to specify the series number when requesting materials from this collection.

Administrative Information

Access Restrictions

This collection is open.

Copyright Notice

Contents of this collection are governed by U.S. copyright law. For questions about publication or reproduction rights, contact Special Collections staff.

Preferred Citation

[Identification of item], [Folder number], [Box number], Seacoast Anti-Pollution League Papers, 1968-1989, MC 136, Milne Special Collections and Archives, University of New Hampshire Library, Durham, NH, USA.

Acquisitions Information

Donations: Jean Lincoln, October 19, 1991; Charles Pratt, January 26, 1994 and December 22, 1994; Seacoast Anti-Pollution League, December 8, 1998 (Accession numbers: 9107, 94.005, 94-046, 98.018)

Collection Arrangement

This collection is arranged into five series, some of which are in turn divided into further subseries. The material is mostly arranged chronologically within each series and subseries.

Collection Contents

Series 1: Seacoast Anti-Pollution League History and Organization, 1970-1989

(8 Boxes)

Subseries A: History

Box 1
Box 1, Folder 1SAPL History, Chronologies
Box 1, Folder 2SAPL History, SAPL Statements
Box 1, Folder 3SAPL History, Reports and Studies Primarily about SAPL

Subseries B: Office Matters

Box 1, Folder 4Phone Logs, dates unclear
Box 1, Folder 51981, SAPL Phone Lists
Box 1, Folder 6April l988, Conference Calls
Box 1, Folder 71979-1989, Minutes of SAPL Meetings
Box 1, Folder 81980, Field Director Job Applicants

Subseries C: Finances

Box 1, Folder 9Miscellaneous Finances
Box 1, Folder 101977-1983, Fundraising, Phone Solicitations
Box 1, Folder 111982, Fundraising, Seacoast Jazz Festival
Box 1, Folder 12-131982, Fundraising, Road Race
Box 1, Folder 141983-1985, Fundraising, SAPL Members Renewal Project
Box 1, Folder 151983, Fundraising, Inquiries to Tom Rush re. benefit concert
Box 1, Folder 161983, Fundraising, Dinner for 2 Raffle
Box 1, Folder 17SAPL Canvass
Box 1, Folder 18Donations and Requests for Information
Box 1, Folder 19Fundraising, T-Shirt Marketing
Box 1, Folder 20Current fundraisers, "Spring Into Summer" Raffle
Box 1, Folder 21Fundraising, Miscellaneous
Box 1, Folder 22Advertising Ideas
Box 1, Folder 23Master Copies of Mailings

Subseries D: Correspondence

Box 2
Box 2, Folder 11970-1979, Correspondence to SAPL
Box 2, Folder 21980, Correspondence to SAPL
Box 2, Folder 31981, Correspondence to SAPL
Box 2, Folder 41981, Correspondence to SAPL re. Industrial Development in Kingston, NH
Box 2, Folder 51982, Correspondence to SAPL
Box 2, Folder 61982, March 1, Correspondence to SAPL from Alexander Sidar re: "The Seabrook Disaster Book Idea"
Box 2, Folder 71983, Correspondence to SAPL
Box 2, Folder 81984, Correspondence to SAPL
Box 2, Folder 91984, Correspondence from Dan Tuthill to SAPL
Box 2, Folder 101985, Correspondence to SAPL
Box 2, Folder 111986, Correspondence to SAPL
Box 2, Folder 121987, Correspondence to SAPL
Box 2, Folder 131988, Correspondence to SAPL
Box 2, Folder 141989, Correspondence to SAPL
Box 2, Folder 15Undated Correspondence to SAPL
Box 2, Folder 161973-1979, Correspondence from SAPL
Box 2, Folder 171980, Correspondence from SAPL
Box 2, Folder 181981, Correspondence from SAPL
Box 2, Folder 191982, Correspondence from SAPL
Box 2, Folder 201983, Correspondence from SAPL
Box 2, Folder 211984, Correspondence from SAPL
Box 2, Folder 221985, Correspondence from SAPL
Box 2, Folder 231986, Correspondence from SAPL
Box 2, Folder 241987, Correspondence from SAPL
Box 2, Folder 251988, Correspondence from SAPL
Box 2, Folder 26Undated Correspondence from SAPL
Box 2, Folder 27Miscellaneous Correspondence

Subseries E: Publications

(see also: Series 1, Box 9)

Box 3
Box 3, Folder 11978-1989, SAPL Press Releases
Box 3, Folder 21984, Sept 4, Press Release with draft material
Box 3, Folder 31972-1989, SAPL News
Box 3, Folder 41982, Newsletter Material
Box 3, Folder 51983, Newsletter Material
Box 3, Folder 61984, [October?], Newsletter Material
Box 3, Folder 7Articles Reprinted by SAPL
Box 3, Folder 8Flyers and Other Printed Material
Box 3, Folder 9Informational Flyers

Subseries F: SAPL Activities

Box 3
Box 3, Folder 101972-1978, SAPL Testimony
Box 3, Folder 111973-1981, General SAPL Activities and Statements
Box 3, Folder 121982, May, Oyster River School Student Comments on SAPL Talk
Box 3, Folder 131982, SAPL vs. NRC, 690 f. 2d. 1025, before US Court of Appeals
Box 3, Folder 141983, Results of SAPL Survey of Radiological Emergency Response Plan[RERP], SAPL Hospital Survey
Box 3, Folder 151983, Notes re. RERP Survey, SAPL Hospital Survey
Box 3, Folder 161983, Correspondence re. RERP Survey, SAPL Hospital Survey
Box 3, Folder 171983, Responses to SAPL RERP Survey, SAPL Hospital Survey
Box 3, Folder 181983, Responses to SAPL RERP Survey, SAPL Hospital Survey
Box 3, Folder 191983, Negative Responses to SAPL RERP Survey, SAPL Hospital Survey
Box 3, Folder 201983, Background Files, RERP Survey of NY Public Interest Research Group, 1982, SAPL Hospital Survey
Box 3, Folder 211983, Background Files, Materials from Dr. Tye's Study re. RERP, SAPL Hospital Survey
Box 3, Folder 221983, Background Files, [1982-1983], Miscellany re. RERP Survey of Hospital Emergency Prep
Box 4
Box 4, Folder 11983-1984, Beach Survey
Box 4, Folder 21986, Signatures on Petitions re Emergency Response Planning

Subseries G: Miscellaneous Notes

Box 4, Folder 3Notes for SAPL's Brief in support of Appeal of Issuance of Partial Operating License before ASLAB
Box 4, Folder 4Notes on Applicant's Response to Interrogatories
Box 4, Folder 5Work Papers, Contentions
Box 4, Folder 6Work Papers, Contentions
Box 4, Folder 7Work Papers, re SAPL Contentions
Box 4, Folder 8Draft SAPL Proposed findings of Fact and Conclusions of Law and Proposed Form of Decision
Box 4, Folder 9Draft of SAPL 4th. Supplemental Petition for Leave to Intervene, re Evacuation Time Estimates, [c.1985]
Box 4, Folder 101986, March 25-26, Notes on Prehearing Conference
Box 4, Folder 111986, Work Papers, SPDS Issues, re SAPL actions vis a vis NH Contention 10, 1986 and following
Box 4, Folder 121986, May 15, Draft of SAPL Contention #31, SAPL 4th Supplemental Petition for Leave to Intervene
Box 4, Folder 13Unidentified Notes

Subseries H: Files on Other Activist Groups

Box 4
Box 4, Folder 14Appeal To Reason
Box 4, Folder 151982-1984, Atlantic Center for the Environment
Box 4, Folder 16Citizen Alert
Box 4, Folder 17Citizen's Clearinghouse on Toxic Waste
Box 4, Folder 181980, CEPAG (Citizen's Energy Policy Advisory Group), CEPAG Report
Box 4, Folder 191977, Citizen's Movement for Safe and Efficient Energy (CMSEE), Critical Mass Journal
Box 5
Box 5, Folder 11978, CMSEE, Critical Mass Journal
Box 5, Folder 2Clamshell Alliance and Affiliated Groups
Box 5, Folder 31987, February to June, Coalition for Reliable energy, (Industry Front Group)
Box 5, Folder 4Committee to Bridge the Gap
Box 5, Folder 5Critical Mass Energy Project
Box 5, Folder 6Critical Mass Energy Project
Box 5, Folder 7Employee's Legal Project, Workers Legal Union
Box 5, Folder 8Energy Systems Research Group
Box 5, Folder 9Environmental Action Foundation, Conference and Other Material
Box 5, Folder 10Environmental Policy Institute, Conference on Nuclear Waste, Options for the Future
Box 5, Folder 111980-1983, Midcoast Health Research Group
Box 5, Folder 121980-1983, Midcoast Health Research Group
Box 6
Box 6, Folder 1Miscellaneous Advocacy Groups
Box 6, Folder 2-31983, March, National Nuclear Intervenors Conference
Box 6, Folder 4Natural Rights
Box 6, Folder 5New England Coalition on Nuclear Pollution
Box 6, Folder 6New England Peace Movement Newsletter
Box 6, Folder 71982-1987, New Hampshire Natural Resources Forum
Box 6, Folder 8Nuclear Control Institute
Box 6, Folder 9Nuclear Information Research Center
Box 6, Folder 10Public Citizen Critical Mass Energy Project
Box 6, Folder 11Radioactive Waste Campaign
Box 6, Folder 12-15Safe Energy Communication Council (SECC)
Box 7
Box 7, Folder 11987, February, Tri-State Coalition for Public Safety
Box 7, Folder 2Union of Concerned Scientists
Box 7, Folder 31981, United Nuclear Opponents
Box 7, Folder 41982-1983, United Nuclear Opponents
Box 7, Folder 5Vermont Public Interest Research Group
Box 7, Folder 6Viewpoint
Box 7, Folder 7Other Nuclear Group Stuff

Subseries I: Miscellaneous

Box 7
Box 7, Folder 81985-1988, "Bob's Articles," Articles by Robert Backus
Box 7, Folder 91987, Forum on Radiological Emergency Response and Seabrook Nuclear Power Plant: Safety Issues and Concerns for Educational Institutions
Box 7, Folder 10Information on Karen Silkwood
Box 7, Folder 111985, Leadership Conference on Nuclear Waste
Box 7, Folder 12Miscellaneous
Box 7, Folder 131982, New England Environmental Conference
Box 8
Box 8, Folder 1NRC Miscellany
Box 8, Folder 2Pamphlets on effective Use of Government and Media Resources
Box 8, Folder 31981, Portsmouth Gasohol Plant
Box 8, Folder 4Public Citizen's Nuclear Waste Study
Box 8, Folder 51979, September, "Unique Wildlife Ecosystem Concept Plan State of New Hampshire," U.S. Dept. of Interior, U.S. Fish and Wildlife Service
Box 8, Folder 6Chris Wood's Paper on State's Rights in Nuclear Licensing
Box 9
Box 9, Folder 1SAPL Flyers and Flyer Material
Box 9, Folder 21981, SAPL Petition re Emergency Planning

Series 2: Preliminary Studies and Ecological Surveys Regarding Seabrook Nuclear Power Plant, 1969-1986

(6 Boxes)
Box 1
Box 1, Folder 11969-1970, Seabrook Ecological Study: Phase I, Hampton Seabrook Estuary, NH
Box 1, Folder 21971, Seabrook Ecological Study
Box 1, Folder 31972-1975, Summary Report of Hydrographic Studies Off Hampton Beach, NH, Sept 1972 to March 1975
Box 1, Folder 41972, October, Report on the Terrestrial effects of Salt Fallout from Thermal Cooling Systems
Box 1, Folder 51972, October, Evaluation of Environmental Effects from Evaporative Heat Dissipation Systems at the Seabrook Site
Box 1, Folder 61972, November, Seabrook Station: Land Planning and Site Design Study
Box 2
Box 2, Folder 11972, December, An Interim Progress Report on the Environmental Study Program Hampton-Seabrook Estuary and Near Offshore Waters
Box 2, Folder 21972-1973, Environmental Study Program, Hampton-Seabrook Estuary and Near Offshore waters
Box 2, Folder 31975, "Summary Reports on Hydrographic Studies Off Hampton Beach, NH, Including the Hampton Harbor Estuary and the Western Gulf of Maine, September 1972 to March 1975," Technical Report VI-8
Box 2, Folder 41973, June, Seabrook Station Preliminary Safety Analysis Report (vol.II), 1 of 7
Box 2, Folder 5-91973, June, Preliminary Safety Analysis
Box 3
Box 3, Folder 11973, June, Preliminary Safety Analysis
Box 3, Folder 21973, June, Seabrook Ecological Study, "The Benthos of the Area Offshore Hampton and Seabrook Beaches, NH," Tech Report IV-5
Box 3, Folder 31973, July, Seabrook Station Preliminary Safety Analysis Report, Amendment 1, revision pages
Box 3, Folder 41973-1974, "Finfish Ecology Investigations at the Hampton-Seabrook Estuary, NH and Adjoining Coastal Waters," Technical Report V-3
Box 3, Folder 5-91974, January, Seabrook Station Preliminary Safety Analysis Report, Amendment 5
Box 4
Box 4, Folder 1-41974, January, Preliminary Safety Analysis Report
Box 4, Folder 51974, May, Geologic, Seismologic and Rock Mechanic Investigations for Seabrook Station
Box 4, Folder 61973-1974, "Hydrothermal Studies of Diffuser Discharge in the Coastal Environment: Seabrook Station for PSCNH"
Box 4, Folder 71974, August 14, Safety Evaluation of the Seabrook Nuclear Power Station, Units 1 and 2, issue date 8/14/74; supplement 8/20/74
Box 4, Folder 81974, August 20, Supplement no.1 to the Safety Evaluation Report by Directorate of Licensing USAEC in matter of PSNH
Box 4, Folder 91974, October, Seabrook Station Containment Aircraft Impact Analysis
Box 4, Folder 101974, October 8, Supplement no.2
Box 4, Folder 111974, December, Roadway Network and Evacuation Study
Box 4, Folder 121974-1975, Seabrook Ecological Study, 1975, "Finfish Ecology Investigations at the Hampton-Seabrook Estuary, NH and Adjoining Coastal Waters," Tech. report VI-7
Box 4, Folder 131975, March 14, Supplement #3 to the Safety Evaluation Report
Box 4, Folder 141975, June, "The Benthos Inhibiting the Area of the Proposed location of the Seabrook Station Intake"
Box 5
Box 5, Folder 11975 to 1976, "The Spatial and Temporal distribution of the Larvae of the Soft-Shelled Clam, Mya Arenaia, in NH Coastal Waters, 7/75 to 11/76," Tech Report VI-10
Box 5, Folder 21975, Nov 14, Supplement #4 to the Safety Evaluation Report
Box 5, Folder 31975, December, "Probability of Coastal Waters Entering the Hampton Harbor Estuary and Neighboring Estuaries as a Function of Distance and Depth Offshore," Tech. Report VI-9
Box 5, Folder 41975, Basic Findings of Fact by the Bulk Power Site Evaluation Committee in Connection with the Proposed Nuclear Generating Facility at Seabrook, NH
Box 5, Folder 51977, December, Summary Document: Assessment of Anticipated Impacts of Construction and Operation of Seabrook Station on the Estuarine, Coastal and Offshore Waters of Hampton-Seabrook, NH
Box 5, Folder 61982, May, Draft Environmental Statement Related to the Operation of Seabrook Station
Box 5, Folder 71982, August, Probabilistic Risk Assessment, "Seabrook Station Probabilistic Safety Assessment," pp.1-99
Box 5, Folder 81982, August, Probabilistic Risk Assessment, pp.100-end
Box 5, Folder 91982, December, Final Environmental Statement Related to Operator of Seabrook Station, Units 1 and 2, USNRC, Dept. of Nuclear Reactor Regulation
Box 6
Box 6, Folder 11984, January to June, Sea Grant Coastal Access Study
Box 6, Folder 21986, July, Safety Evaluation Report Related to the Operation of Seabrook Station Units 1 and 2

Series 3: Seabrook Construction Licensing Issues, 1972-1978

(15 Boxes)
Box 1
Box 1, Folder 11972, March 31, PSCNH Long range Plans for Bulk Power Supply Facilities
Box 1, Folder 21972, October 3, State of New Hampshire Joint Hearings of the Public Utilities Commission[PUC] and the Site Evaluation Committee, vol.5, pp.706 to 876
Box 1, Folder 31972, October 4, Joint Hearings, vol.6, pp.787 to 1047
Box 1, Folder 41972, October, Joint Hearings, vol.7, pp.1048 to 1271
Box 1, Folder 51972, October 31, Joint Hearings, vol.9, pp. 1495 to 1589
Box 1, Folder 6Joint Hearings, vol.11, pp. 1886 to 2050
Box 2
Box 2, Folder 11972, November, Joint Hearings, vol.12, pp.2051 to 2235
Box 2, Folder 21972, November, Joint Hearings, vol.13, pp.2236 to 2402
Box 2, Folder 31972, November 21, Joint Hearings, vol.14, pp.2403 to 2641
Box 2, Folder 41972, December 6, Joint Hearings, vol.15, pp.2642 to 2790
Box 2, Folder 51972, December 12, Joint Hearings, vol.17, pp.2894 to 3037
Box 2, Folder 61972, December 19, Joint Hearings, vol.l8, pp.3038 to 3174
Box 3
Box 3, Folder 11973, January 11, Joint Hearings, vol.19, pp.3175 to 3361
Box 3, Folder 21973, January 12, Joint Hearings, vol.20, pp.3362 to 3489
Box 3, Folder 31973, January 18, Joint Hearings, vol.21, pp.3490 to 3596
Box 3, Folder 41973, February 8, Joint Hearings, vol.22, pp.3597 to 3815
Box 3, Folder 51973, February 9, Joint Hearings, vol.23, pp.3816 to 3941
Box 3, Folder 61973, February 9, Joint Hearings, vol.23, pp.3942 to 4082
Box 3, Folder 71973, March 8, Joint Hearings, vol.24, pp.4083 to 4288
Box 4
Box 4, Folder 11973, March 9, Joint Hearings, vol.25, pp.4289 to 4460
Box 4, Folder 21973, March 22, Joint Hearings, vol.26, pp.4461 to 4686
Box 4, Folder 31973, March 23, Joint Hearings, vol.27, pp.4687 to 4930
Box 4, Folder 41973, April 13, Joint Hearings, vol.29, pp.5103 to 5308
Box 4, Folder 51973, May 4, Joint Hearings, vol.30, pp.5309 to 5423
Box 5
Box 5, Folder 11973, May 21, Joint Hearings, vol.31, pp.5454 to 5544
Box 5, Folder 21973, May 21, Joint Hearings, vol.31, pp.5545 to 5663
Box 5, Folder 31973, May 25, Joint Hearings, vol.32, pp.5664 to 5776
Box 5, Folder 41973, May 25, Joint Hearings, vol.32, pp.5777 to 5880
Box 5, Folder 51974, February 4, Testimony of Dr. Charles Chichetti and William Gillen before the State of NH PUC and Bulk Power Supply Site Committee, l of 4
Box 5, Folder 61974, February 4, Testimony, 2 of 4
Box 5, Folder 71974, February 4, Testimony, 3 of 4
Box 5, Folder 81974, February 4, Testimony, 4 of 4
Box 5, Folder 91974, March 11, Public Hearings before the US Atomic Energy Commission, vol.2, pp.93 to 332
Box 6
Box 6, Folder 11974, December 12, Public Hearings, vol.5, pp.634 to 748
Box 6, Folder 21975, April 16, Public Hearings, vol.6, pp.749 to 970
Box 6, Folder 31975, May 29, Public Hearings, vol.9, pt.1, pp.1327 to 1448
Box 6, Folder 41975, May 29, Public Hearings, vol.9, pt.2, pp.l449 to 1601
Box 6, Folder 51975, May 30, Public Hearings, vol.10, pt.1, pp.l602 to 1732
Box 6, Folder 61975, May 30, Public Hearings, vol.10, pt.2, pp.1733 to 1866
Box 7
Box 7, Folder 11975, June 30, Public Hearings, pp.4217 to 4397
Box 7, Folder 21975, July 1, Public Hearings, vol.14, pp.4398 to 4591
Box 7, Folder 31975, July 2, Public Hearings, vol.15, pp.4592 to 4774
Box 7, Folder 41975, July 3, Public Hearings, vol.16, pp.4775 to 4957
Box 7, Folder 51975, August 26, Public Hearings, vol.l7, pp.4958 to 5174
Box 8
Box 8, Folder 11975, August 27, Public Hearings, vol.18, pp.5175 to 5313
Box 8, Folder 21975, August 28, Public Hearings, vol.l9, pp.5314 to 5538
Box 8, Folder 3-41975, September 3, Public Hearings, pp.5709 to 5818, with Final Environmental Impact Statement, 1 of 2
Box 8, Folder 51975, September 17, Public Hearings, vol.22, pp.7108 to 7315
Box 9
Box 9, Folder 11975, October 22, Public Hearings, vol.32, pp.9857 to 10070
Box 9, Folder 21975, October 23, Public Hearings, vol.33, pp.10071 to 10270
Box 9, Folder 31975, October 24, Public Hearings, vol.34, pp.10271 to 10415
Box 9, Folder 41975, October 29, Public Hearings, vol.36, pp.10621 to 10747
Box 9, Folder 51975, October 30, Public Hearings, vol.37, pt.1, 10748 to 10840
Box 9, Folder 61975, October 30, Public Hearings, vol.37, pt.2, 10841 to 10969
Box 10
Box 10, Folder 11975, [November 1], Public Hearings, vol.38, pp.10970 to 11053
Box 10, Folder 21975, November 4, Public Hearings, vol.39, pt.1, pp.11054 to 11006
Box 10, Folder 31975, November 4, Public Hearings, vol.39, pt.2, Applicants Direct Testimony #23
Box 10, Folder 41975, November 4, Public Hearings, vol.39, pt.3, pp.1107 to 11229
Box 10, Folder 51975, November 5, Public Hearings, vol.40, pp.11230 to 11406
Box 10, Folder 61975, November 6, Public Hearings, vol.41, pt.1, pp.11407 to 11426
Box 10, Folder 71975, November 6, Public Hearings, vol.41, pt.2, pp.11427 to 11579
Box 10, Folder 81975, November 7, Public Hearings, vol.42, pp.11580 to 11656
Box 11
Box 11, Folder 11975, November 18, Public Hearings, vol.43, pp.11657 to 11835
Box 11, Folder 21975, November 24, Public Hearings, vol.44, pp.12018 to 12217
Box 11, Folder 31976, February 25, Public Hearings, vol.45, pp.12218 to 12419
Box 11, Folder 41976, February 27, Public Hearings, pp.12674 to 12714
Box 11, Folder 51974, Seabrook Master Schedules, Revised as of January 1974
Box 11, Folder 61974, PSCo Responses to Intervenors
Box 11, Folder 71975, February 7, Information Submitted to EPA in Connection with PSCoNH Application for a 316(a) Exemption
Box 12
Box 12, Folder 11975, May 21, Memorandum and Order, (ALAB-271)
Box 12, Folder 21975, June 18, Letter from Bruce Bekley, project manager PSNH, to Dr. R. P. Geckel, project manager USNRC
Box 12, Folder 31975, July 30, Letter, Gossick to Thompson
Box 12, Folder 41975, August, Affidavit, Testimony of James Gekas of Federal Power Commission before ASLB
Box 12, Folder 5-91975, August, Fire Protection System Evaluation and Comparison to Branch Technical Position
Box 12, Folder 101975, September 2, New England Coalition on Nuclear Pollution Testimony on Energy Alternatives
Box 12, Folder 111975, September 4, Commonwealth of Massachusetts Testimony on Alternative Energy Sources I, Solid Waste Resource Recovery Before ASLB
Box 12, Folder 121975, November 11, Motion for Reconsideration of Board Decision Not to Extend Hearings on Cost-Benefit Issue
Box 12, Folder 131975, December 15, Requests for Proposed Findings of Facts and Rulings of Law Submitted by SAPL and the Audubon Society of NH
Box 12, Folder 141975, December 16, Applicant's response to Motion of NECNP et al, ASLAB and ALSB
Box 12, Folder 151975, December, Applicant's Proposed Findings of Fact and Conclusions of Law in the Form of a Proposed finding of Law
Box 12, Folder 16[1975], NRC Staff Testimony on Cost-Benefit Analysis, before ASLB
Box 12, Folder 171976, February 18, Applicant's Response to SAPL Renewed Motion to Reopen Hearing Filed on Behalf of Intervenor SAPL on Issue of Financial Qualifications
Box 12, Folder 181976, February 26, Testimony of Robert Mitchell before ASLB
Box 12, Folder 191976, July 20, Affidavit of Bruce B. Beckley before ASLB
Box 13
Box 13, Folder 11976, September 17, Brief of Applicant in Support of Its Exceptions
Box 13, Folder 21976, September 30, Memorandum and Order
Box 13, Folder 31976, October 6, Memorandum and Order
Box 13, Folder 41976, October 18, On Review of a Decision of the ASLAB, Brief of Applicants before NRC
Box 13, Folder 51976, October, NRC, Start of Cooling System Trouble
Box 13, Folder 61976, October, Applicant's Presentation Concerning SAPL and Audubon Motion for Reconsideration of ALAB-338 in Light of Court Order of Oct.8, 1976
Box 13, Folder 71976, November 5, Memorandum and Order
Box 13, Folder 81976, November 12, Brief of Applicant's in Opposition to Certain Exceptions of Other Parties on exception to the Initial decision of the ASLB
Box 13, Folder 91976, November l2, NRC Staff Brief in Response to the Exceptions to the Initial Decision of All Other Par ties
Box 13, Folder 101976, November, EPA, Region I, Initial Decision
Box 13, Folder 111976, November to December, Start of Cooling Trouble
Box 13, Folder 12-131976-1979, Testimony, Miscellaneous
Box 13, Folder 141976, Atomic Safety and Licensing Board
Box 14
Box 14, Folder 1-21976, Atomic Safety and Licensing Board
Box 14, Folder 31976-1977, Fire Protection for Nuclear Plants
Box 14, Folder 41977, January 31, Applicant's Response to Inquiries of the Commissioner for Further Stay of Order Suspending Construction Permits, Brief of Applicants on Merit
Box 14, Folder 51977, January, ALSAB
Box 14, Folder 61977, January to March, NRC re. Cooling Tunnels, Alternate Sites
Box 14, Folder 71977, January to November, ALSB
Box 14, Folder 81977, February 11, On Review of a Decision of the ASLAB, Brief of Applicants in response to the Commission's Order of February 7, 1977
Box 14, Folder 91977, February 11, Commonwealth of Massachusetts Reply to Commission's Order of February 7, 1977
Box 14, Folder 101977, February 19, NECNP Response to Commission Order of February 7, 1977
Box 14, Folder 111977, April to November, NRC re. Cooling Tunnels, Alternate Sites
Box 15
Box 15, Folder 11977, February 17, Staff Reply to NECNP Brief
Box 15, Folder 21977, February, NRC, GAO Investigation of Seabrook
Box 15, Folder 31977, March to October, EPA Costle 'Yes' Decision, SAPL Motion for Stay
Box 15, Folder 41977, February to July, ASLAB
Box 15, Folder 51977, March 31, Appearances and Memorandum and Order
Box 15, Folder 61977, June, SAPL and EPA as Remanded by 1st. Circuit Court
Box 15, Folder 71977, July to December, ASLB
Box 15, Folder 81977, July, ASLAB
Box 15, Folder 91977, September, SAPL vs. Costle, 1st. Circuit Court
Box 15, Folder 101977, September, NRC to PSNH re. Physical Security at Plants
Box 15, Folder 111977, November, NRC to PSNH re Additional Information Needed Prior to Issuance of Operating License
Box 15, Folder 12[1977?], NECNP Response to Staff's Motion to Reopen the Record
Box 15, Folder 131978, January 16, Brief of Applicants in Opposition to Exceptions
Box 15, Folder 141978, January to April, Issues with the NRC

Series 4: Operating License Issues 50-443-OL, 50-444-OL, 1969-1986

(38 Boxes)

Subseries A: On-site Issues

Box 1
Box 1, Folder 11978, February to March, SAPL Cases before the 1st. Circuit Court of Appeals
Box 1, Folder 21978, February to April, 5APL before the ASLAB
Box 1, Folder 31978, April 28, SAPL before the ASLAB
Box 1, Folder 41978, May to June, Issues with the NRC
Box 1, Folder 51978, May to June, SAPL vs. Costle (EPA), 1st. Circuit Court of Appeals
Box 1, Folder 61978, June to November, SAPL before the ASLAB
Box 1, Folder 7-91978, July, Correspondence to Costle (EPA) re. Cooling Tunnels
Box 1, Folder 101978, July to September, Issues with the NRC
Box 2
Box 2, Folder 11979, January to April, Miscellaneous $, Assorted Financial PSNH
Box 2, Folder 21979, May, SAPL vs. NRC, 1st. Circuit Court of Appeals
Box 2, Folder 3-41979, May, "Safety and Relief Valves for PSNH", Seismic Calculations
Box 2, Folder 5-81979-1981, NRC Show Cause Order, Evacuation/Class 9 (started 6/2/79), includes support material
Box 2, Folder 91979, September, Permittee's Response to Motion to Suspend Construction, re. Seismic Concerns
Box 2, Folder 101979, House Bill 671, To Prevent Siting of a Nuclear Plant in a Town without a Vote
Box 2, Folder 111979, House Bill 779, re Siting of Nuclear Facilities
Box 2, Folder 121980, November 18, Response to NRC Staff in Opposition to Motion to Suspend Construction
Box 2, Folder 131980, September to December, ASLAB, re Adequacy of Seismic Calculations vis a vis Seabrook
Box 2, Folder 141981, June to July, Newsclips Evacuation Show Cause Order
Box 2, Folder 151982, January, Proposed Rule on Environmental Qualification of Electrical Equipment
Box 2, Folder 161984, January, Results of In-Progress Audit of Seabrook Station Detailed Control Room Design Review
Box 2, Folder 17-191984, March to August, Financial Qualifications as Requirement for OL
Box 3
Box 3, Folder 11984-1986, NECNP IB.2, Safety and On-Site Emergency Planning Issues 5/84 to 9/86
Box 3, Folder 2-31985-1986, NRC Staff Status Reports , On-Site Emergency Planning, 10/85 to 9/86, 1 of 2
Box 3, Folder 41986, March to June, Integrated Design Inspection Report
Box 3, Folder 51986, April to June, Integrated Design Inspection Report
Box 3, Folder 6-91986, July, Contention NH 10, SAPL supp.6, re Control Room Design [SAPL took over the contention of NH in July 1986 after the State dropped it]
Box 4
Box 4, Folder 1Contention NH 10, SAPL supp.6, Pt.II, 4/83 to 6/86
Box 4, Folder 2Contention NH 10, SAPL supp.6, Pt.II, 7/86 to 8/8/86
Box 4, Folder 3Contention NH 10, SAPL supp.6, Pt.II, 8/18/86 to 9/17/86
Box 4, Folder 41986, Work Papers, SPDS Issues re SAPL actions Vis a Vis NH Contention 10
Box 4, Folder 5-161986, September 26, Draft SAPL supp.6. Hearings of Advisory Committee on Reactor Safeguards Subcommittee on Severe Accidents and Subcommittee on Occupational and Environmental Protection Systems
Box 4, Folder 171986, October, SAPL Brief and Other Material re On-Site Issues
Box 5
Box 5, Folder 11987, April, Suggestion of Mootness, On Site Emergency Planning and Technical Issues
Box 5, Folder 2-31987-1988, On-Site Emergency Planning, NECNP Pleadings re Coaxial Cable, 2 of 2, 11/87 to 5/88
Box 5, Folder 4-91987-1988, NECNP and Steam Generator and Bio-Fouling On-Site Issues, 11/20/87 to 1/7/88)
Box 5, Folder 101988-1989, On-Site Emergency Planning[1/88-7/89]
Box 5, Folder 111989, January 23, NRC Staff Response to Joint Intervenors' Motions for reconsideration of CLI-88-lQ
Box 5, Folder 121989, March 15, NRC Staff Response in opposition to Joint Intervenor's Appeal of LBP-89-09
Box 5, Folder 131989, May 11, NRC Staff Response to Intervenors' Motions for a Stay of Low Power Operation Pending Commission of Appellate Review
Box 5, Folder 141989, May 24, NRC Staff Response to Intervenors' Motion for Reconsideration of CLI-89-08 and Renewed Motion for Stay of Issuance of Low Power License
Box 5, Folder 15(?) Safety and Relief Valves for PSNH", 2nd. Proposal Rough Draft
Box 5, Folder 16NRC Staff Testimony on Alternative Sites before the ASLB
Box 6
Box 6, Folder 1Applicant's Direct Testimony, #6, before the ASLB, re Compliance with 10 CFR 100
Box 6, Folder 2Applicant's Direct Testimony, #9, before the ASLB, re Effects on Commercial and Sport Fishing
Box 6, Folder 3Applicant's Direct Testimony, #10, before the ASLB, re Effects of Construction and Operation on Clam Flats and Clam Populations
Box 6, Folder 4Applicant's Direct Testimony, #13, before the ALSB, re Decommissioning
Box 6, Folder 5Applicant's Direct Testimony, #23, before the ASLB, re Energy and Peak Local Forecasts and Generating Capacity requirements
Box 6, Folder 6Applicant's Direct Testimony, #26, before the ASLB, re NE Utility's Press Releases
Box 6, Folder 7SAPL Direct Testimony on Need for Power, before the ASLB

Subseries B: Off-site Issues

  • Hearings of the NRC (primarily the ASLB) (B. 6 f. 8-B. 20 f. 18)
  • New Hampshire Off-Site Emergency Preparations and Miscellany (B. 21 f. 1-B. 22 f. 8)
  • Massachusetts Off-Site Emergency Preparations (B. 22 f. 9-B. 23 f. 3)
  • Other Government Bodies Involved in Emergency Preparation Issues: Congress, Courts, FEMA, NRC, Miscellaneous Goverment Groups (B. 23 f. 4-B. 27 f. 10)
  • Miscellaneous Subject Files, re: Emergency Planning (B. 27 f. 11-B. 31 f. 10)
Box 6, Folder 81981-1982, Meeting at NRC, Environmental Review Team, 12/2/81, Meetings 5/21/82
Box 6, Folder 91981, July 15, Denton's Decision re Emergency Planning
Box 6, Folder 101982, May 6 and 7, 1st. Prehearing Conference
Box 6, Folder 111982, July, 2nd. Prehearing Conference
Box 6, Folder 12-131982, July, Response to [Inquiries][RAD?](Emergency Preparedness Licensing[?]
Box 6, Folder 141982, July to December, Risk Study, Richard, Lowe and Garrick, Einal Environmental Analysis
Box 6, Folder 151982, September 13, Memorandum and Order
Box 6, Folder 16-181982-1983, NECNP Contentions, 10/82 to 7/83
Box 7
Box 7, Folder 11982-1983, NECNP Contentions
Box 7, Folder 21982, November 17, Memorandum and Order Addressing Intervenor's Motions for Reconsideration of the Board's Prehearing Conference Order and Motions for Certification
Box 7, Folder 31982-1983, NH State Interrogatories and PSNH Replies
Box 7, Folder 4-61982-1983, Interested Towns Under 2.715 of the Code of Federal Regulations, 11/82 to 5/83
Box 7, Folder 71982-1983, ASLB Board Orders, 11/82 to 8/83
Box 7, Folder 81983, January 10, Newburyport Plan(Draft)
Box 7, Folder 91983-1986, Reactor Pressure Vessel Indication, supp. cont.7, 2/83 to 5/86
Box 7, Folder 101983, March, Safety Evaluation Report
Box 7, Folder 11-121983, March, SAPL Supplement 3, Class 9 Accident and Consequences and Summary Disposition Motion
Box 8
Box 8, Folder 11983, March, SAPL Supplement 3...
Box 8, Folder 21983, March, Correspondence from Herb Moyer
Box 8, Folder 3-61983, March to September, Actions of Mass. Attorney General's Office re RERP
Box 8, Folder 71983, April 7 and 8, 3rd. Prehearing Conference
Box 8, Folder 81983, May 3, SAPL's Supplemental Responses to Applicant's Interrogatories and Request for Production of Documents
Box 8, Folder 91983, June to July, Appeal Board
Box 8, Folder 10-121983, July to August, Hearings re Evacuation Time Estimates, NECP III12 and III13
Box 8, Folder 131983-1986, Control room Design Audit, 7/83 to 2/86
Box 8, Folder 141983, September 29, Discovery on Emergency Plans
Box 8, Folder 151983-1984, Motion to Dismiss Unit II's OL Application, 10/83 to 3/84
Box 9
Box 9, Folder 11983, August, Newsclips, 1st. Phase ASLB Hearings, Seabrook OL
Box 9, Folder 2-41983, August, Emergency Planning I, Documents before August 1983 Hearings
Box 9, Folder 5-71983, August to September, Emergency Planning II, filings Subsequent to Aug. 1983 Hearings through Sept., Contentions of So.Hampton, Rensington, Hampton Falls, Rye
Box 9, Folder 8-12Emergency Planning III
Box 10
Box 10, Folder 1Emergency Planning III
Box 10, Folder 2-31983, Markowitz Affidavit
Box 10, Folder 41984, December, ETE Rebuttal
Box 10, Folder 51985-1987, Maine Attorney General re Qff-Site EP, 3/85 to 10/87
Box 10, Folder 61985-1986, Applicant's Material re Off-Site EP Issues, 6/85 to 10/86
Box 10, Folder 71985-1986, Testimony re NECNP EQ Contention(I.B.2), 10/85 to 9/86
Box 11
Box 11, Folder 11985-1986, Massachusetts' Actions re Emergency Response Planning, 11/19/85 to 2/21/86
Box 11, Folder 21986, January to May, SAPL's Supplemental Reply to Applicant's Interrogatories
Box 11, Folder 31986-1987, Rye re Off-Site EP, 1/86 to 11/87
Box 11, Folder 41986, February to June, South Hampton re Off-Site EP
Box 11, Folder 51986, February to October, Kensington re Off-Site EP
Box 11, Folder 6-71986, February to December, SAPL's Contentions on NHRERP
Box 11, Folder 81986-1987, Board Correspondence re Off-Site EP, 2/86 to 12/87
Box 11, Folder 9-111986-1987, NECNP re Seabrook Operating License, 2/24/86 to 5/14/86
Box 12
Box 12, Folder 1-51986-1987, NECNP..., 11/12/86 to 12/4/86
Box 12, Folder 61986, March to November, State of New Hampshire, re EP and Off-Site Issues
Box 12, Folder 7-91986-1987, Applicant's Motion for Summary Disposition re SAPL Contentions During Hearings on Off-Site EP Issues, 3/86 to 7/87
Box 12, Folder 101986, March, Merrimack, NH re Off-Site EP
Box 12, Folder 111986, March 24 to May 15, Massachusetts' Actions re RERP
Box 12, Folder 121986-1987, SAPL's Contentions re Off-Site Emergency Prep, 3/86 to 3/8
Box 13
Box 13, Folder 1-31986-1987, SAPL's Contentions...
Box 13, Folder 41986, Exeter re Off-Site EP, 4/86 to 5/86
Box 13, Folder 51986, April, SAPL's Interrogatories and Documents Requests, State of NH
Box 13, Folder 61986, April to June, State of New Hampshire Interrogatories and Answers
Box 13, Folder 71986, April to July, Draft License, etc
Box 13, Folder 81986-1987, EPZ Reduction, 4/86 to 4/87
Box 13, Folder 91986, May 14, State's response to NECNP's Interrogatories and Requests for Docs
Box 13, Folder 101986, May 15, SAPL's 4th. Supplemental Petition for Leave to Intervene
Box 13, Folder 111986, May 21 to July 10, Massachusetts' actions re ERP
Box 13, Folder 12-131986, May, Motions for Sum. Dismissal by PSNH
Box 14
Box 14, Folder 11986, May, Off-Site Emergency Planning Issues, Affidavits
Box 14, Folder 21986, May, Off-Site Emergency Planning Issues, Affidavits
Box 14, Folder 31986, May, Off-Site Emergency Planning Issues, Motions for Summary Disposition
Box 14, Folder 41986, June 27, SAPL Response and Objection to PSNH Pursuit of Low Power OL
Box 14, Folder 51986-1987, Hampton Falls, NH re Off-Site Ep, 6/86 to 11/87
Box 14, Folder 61986-1987, Town of Amesbury, MA, Emergency Response Plans and ASLB, 7/86 to 11/87
Box 14, Folder 71986, August 15 to December 30, MA. Actions re ERP
Box 14, Folder 8-131986-1988, Letters to Board(ASLB), 9/86 to 4/88
Box 14, Folder 141986-1988, Sept to Oct, Seabrook(Town of) re Off-Site EP
Box 14, Folder 151986-1987, Commonwealth of Massachusetts response to Zone Reduction Plan, ERP, 10/86 to 1/87
Box 15
Box 15, Folder 11986-1987, MA. Response to Zone Reduction Plan
Box 15, Folder 2-31986-1987, O% License Appeal, 10/86 to 1/87
Box 15, Folder 41986-1987, State of New Hampshire, re Emergency Planning and Off-Site Issues, 12/86 to 10/87
Box 15, Folder 51986-1987, MA. Actions re ERP, 12/30/86 to 3/25/87
Box 15, Folder 61986, Miscellaneous re Off-Site Emergency Planning and Safety Issues
Box 15, Folder 71987, January 16, Excerpt of Transcript from LEA's Contentions as an Intervenor at Limerick
Box 15, Folder 81987, January, Phillips Exeter Academy re Reduction of EPZ
Box 15, Folder 91987-1988, January, ASLB Hearing Notes
Box 15, Folder 101987, March 30 to April 15, MA. Actions re ERP
Box 15, Folder 111987, March to June, Miscellaneous Material Dealing with Off-Site Emergency Prep before NRC
Box 16
Box 16, Folder 11987, April 27 to June 15, MA. Actions re ERP
Box 16, Folder 21987, April, Affidavits
Box 16, Folder 31987-1988, Testimony and Notes re Seabrook Area Traffic and Off-Site Emergency Planning Hearings, 4/87 to 1/88
Box 16, Folder 4-51987, May 7, Information re KLD Survey to SAPL from MA. A.G.
Box 16, Folder 6-71987, May to Sept, Off-Site EP
Box 16, Folder 81987, May to Dec, SAPL re Off-Site Emergency Planning
Box 16, Folder 91987, June 11, Mileti Deposition, pp.l-60
Box 16, Folder 101987, June 11, Mileti Deposition, pp.61-126
Box 16, Folder 111987, June 11, Mileti Deposition. pp.127-end
Box 16, Folder 121987, June 29 to November, Mass Actions re ERP
Box 16, Folder 131987, June to July, Applicant's Discovery re Off-Site Emergency Planning
Box 17
Box 17, Folder 1-31987-1988, Utility Plan re Submission of MA. Plan (SPMC), Vacation of Stay, 7/87 to 2/88
Box 17, Folder 41987, September 11, Testimony of David P. MacDonald for SAPL re SAPL Contentions 8 and 8a Relative to the Town of Rye
Box 17, Folder 51987, September 14, Testimony of Avishai Ceder, Off-Site Emergency Prep
Box 17, Folder 61987, September 14, Testimony of Thomas J. Adler, Off-Site Emergency Prep
Box 17, Folder 71987, September 14, Testimony of Colin High, Thomas J. Adler and William A. Befort, Off-Site Emergency Prep
Box 17, Folder 8-91987, September 14, Testimony of Dr. Albert Luloff on Behalf of James Shannon, MA. A.G., re Off-Site EP
Box 17, Folder 101987, September 14, Testimony of Donald J. Zeigler, James H. Johnson Jr., and Stephen Cole on behalf of the MA. A.G.
Box 18
Box 18, Folder 11987, September 14, Test. of Zeigler et al..
Box 18, Folder 21987, September 14, Testimony of Steven Sholly on the Technical Basis for NRC E.P. Rules, etc...
Box 18, Folder 31987, September 14, Attachments to the Testimony of Steven C. Sholly
Box 18, Folder 41987, September, Off-Site EP Issues, Prefiled Testimony
Box 18, Folder 51987, September, Testimony of Dr. Thomas Urbanik II on Behalf of the NRC Staff on Town of Hampton Contention III and SAPL Contentions 18, 31, 34 and 37
Box 18, Folder 61987-1988, re Atty. General Shannon and hearings on NHRERP, 9/87 to 2/88
Box 18, Folder 7-91987-1988, Sheltering Issues, 9/87 to 3/88
Box 18, Folder 101987-1988, October, PSNH Testimony on Notification/Communications in Evacuation Plans
Box 18, Folder 111987-1988, Proposed Findings for SAPL Contentions before the ASLAB, 10/87 to 2/88
Box 18, Folder 121987, October, Testimony of Daniel Trahan on Behalf of Town of Hampton and SAPL Regarding Town of Hampton Revised Contentions III, IV and V and SAPL Contentions 16, 25
Box 18, Folder 131987, December 14, Documents re Testimony of Dr. Albert Luloff for A.G. of MA
Box 19
Box 19, Folder 1-21988, January 7, MA. Actions re ERP.
Box 19, Folder 31988, January 11 to March 18, MA. Actions re ERP.
Box 19, Folder 41988, January 12, Hearings Before ASLB, Off-Site Emergency Planning Evidentiary Hearings
Box 19, Folder 5-71988-1989, Scheduling Pleadings, SPMC Litigation, 2/88 to 2/89
Box 19, Folder 81988, April 7 to May 2, MA. Actions re ERP
Box 19, Folder 91988, June 30 to July 6, MA. Actions re ERP
Box 19, Folder 101988, July 7, MA. Actions re ERP
Box 20
Box 20, Folder 11988, July 20 to October 19, MA. Actions re ERP
Box 20, Folder 21988, November, Meeting with PSNH re Low Power License
Box 20, Folder 31989, February, Commission Target Data, FOIA Request in re Target Schedule for Final Initial Decision in PSNH et al
Box 20, Folder 4-51989, March 1, Mass. Actions re ERP
Box 20, Folder 61989, March 7 to 17, NRC Staff's Pre-trial brief on Contentions Concerning the Seabrook Plan for MA. Communities (SPMC) and Supplemental Requests
Box 20, Folder 71989, March 16 to May 16, Mass Actions re ERP
Box 20, Folder 81989, March 17, NRC Staff Motion for Leave to File Out of Time
Box 20, Folder 91989, March 17, NRC Staff's Opposition to MA. AG's Motion for Directed Certification Qf LBP-89-8
Box 20, Folder 101989, April 3, Letter from Flynn, Ass. General Council to FEMA, to ASLB re PSNH et al
Box 20, Folder 111989, April 17, NRC Staff Motion to Strike Intervenor's Notices of Appeal of LBP-89-10
Box 20, Folder 121989, May 8, Letter with Enclosures from We the People to Samuel Chilk, Secretary NRC
Box 20, Folder 131989, May 11, MA. AG's Opposition to Applicant's Motion to Dismiss Joint Intervenor Contentions
Box 20, Folder 141989, May 16 to 31, MA. Actions re ERP
Box 20, Folder 151984, May 21, Declaration of Vernon E. Adler before the ASLB re PSNH et al
Box 20, Folder 161989, May 22, NRC Staff's Response to MA. AG's Motion for Directed Classification of the Licensing Board's Oral Ruling Dismissing Contention l9(D)
Box 20, Folder 171989, June 12 to July 17, MA. Actions re ERP
Box 20, Folder 181989, September 25, Emergency Exercise Objective and Scenario Guidelines for Exercise Schedule
Box 21
Box 21, Folder 11981-1986, Civil Defense Meetings, Letters, etc, 6/81 to 2/86
Box 21, Folder 21982-1983, Local Plan Review, 10/82 to 10/83
Box 21, Folder 31982-1984, Seacoast Evacuation, 11/82 to 2/84
Box 21, Folder 41983, February to March, Chamber of Commerce, Hampton Beach Area, Before the NRC
Box 21, Folder 5[1984], Exeter Citizens Concerned About Evacuation Planning
Box 21, Folder 61985, April to November, Newsclips on Evacuation
Box 21, Folder 71985, May to October, Town Councilors, letter to, re Evacuation
Box 21, Folder 81985-1986, Citizen's Meeting re Emergency Planning, 10/85 to 4/86
Box 21, Folder 91986, January, revision 1 of NHRERP
Box 21, Folder 101986, March to April, Town Meetings and Nuclear Dump Resolution
Box 21, Folder 111986-1987, League of Towns, 6/86 to 3/87
Box 21, Folder 121986, November 10, R.L. Kaufmann's Comments on NHRERP
Box 21, Folder 131986-1987, Strategy Meeting re Seabrook Interventions, 12/86 to 6/87
Box 21, Folder 141986-1988, Correspondence re NHRERP (not SAPL originated)
Box 21, Folder 151987, State Legislation
Box 21, Folder 161988, June 28, Miscellaneous Evacuation
Box 21, Folder 17-201988, November 28, Update of NHRERP
Box 22
Box 22, Folder 11988, November 28, Update of NHRERP
Box 22, Folder 2Data from Plans, Rev.0, re Off-Site Emergency Plans
Box 22, Folder 3Data from Plans, Rev.2
Box 22, Folder 4Notebook, Notes on Rev.2 RERP
Box 22, Folder 5Notes re RERP
Box 22, Folder 6State of New Hampshire Radiological Emergency Response Plan
Box 22, Folder 7Town Plan Contention Notes
Box 22, Folder 8Warrant Articles re Evacuation
Box 22, Folder 9-111985-1986, Massachusetts Evacuation Plans, 1/85 to 11/86
Box 22, Folder 12[1985], MA. A.G.'s Letter to Towns
Box 22, Folder 131985, June to August, MMWEC Report, Section on Emergency Planning
Box 22, Folder 141986, January 10, Evacuation Plan Update for Seabrook Station, Progress Report 3, Produced by KLD and Associates for the State of Massachusetts
Box 22, Folder 151986, January 18, Evac Plan Update, Progress Report 4
Box 22, Folder 161986, February 18, Evac Plan Update, Progress Report 5
Box 22, Folder 171986, April, Evac Plan Update, ETE by KLD, Progress Report 6 and final
Box 23
Box 23, Folder 11986, April, Evacuation Plan Update, Progress Report 7 for MA. CDA and OEP
Box 23, Folder 2Notes on KLD Evac Time Estimates and Reports in their Progress in Making Them
Box 23, Folder 3KLD Survey of Seabrook Area
Box 23, Folder 41981, Congressional Committees
Box 23, Folder 51982, November to December, Sandia Report (NUREG/CR 2239), Technical Consequences for Siting Criteria Development and Dangers of Meltdown
Box 23, Folder 61983, June to November, Licensing "Reform" Legislation
Box 23, Folder 71983-1984, Temporary Operating License Legislation
Box 23, Folder 81983, Senator Simpson Weakens Emergency Planning Regs
Box 23, Folder 91983-1984, Simpson's 2nd. Onslaught on Emergency Planning
Box 23, Folder 101986, October 10, ACRS(Advisory Committee on Reactor Safeguards) Hearings
Box 23, Folder 111986, "Licensing Reform"
Box 23, Folder 12-141986-1987, Price-Anderson Act
Box 24
Box 24, Folder 11987, Congressional Legislation
Box 24, Folder 21987-1988, Humphrey, Gordon, re Emergency Planning, 1/87 to 12/88
Box 24, Folder 31988, NRC "Reform" Bill
Box 24, Folder 41981, DC Circuit Court of Appeal, 81-2146
Box 24, Folder 51983, Supreme Court Ruling on California Moratorium
Box 24, Folder 619881986, August, Suit v. NRC re Training for Nuclear Plant Workers, sect. 306 of NWPA.
Box 24, Folder 719881986, Decommissioning Suit Hearings, Cushing v. Sununu et al
Box 24, Folder 819881987, February, Motion for Partial Summary Judgement in Hampton v. State et al
Box 24, Folder 9Nuclear Litigation, Legal Precedents, Notes
Box 24, Folder 101980, January to October, SAPL-FEMA
Box 24, Folder 111980, Seabrook Station Evacuation Analysis Prepared for FEMA
Box 24, Folder 121985-1986, Pressure on FEMA, 3/85 to 6/86
Box 24, Folder 131986, February to June, FEMA Graded Exercises for Emergency Evacuation
Box 24, Folder 141988, January to October, Memorandum re Review of Seabrook Plan for Massachusetts Communities
Box 24, Folder 151988, October, Review and Evaluation of Seabrook Plan for MA. Communities
Box 24, Folder 161988, November 22, Response of FEMA to Town of Amesbury's First Set of Interrogatories and Request for Production of Documents to FEMA on Seabrook Plan for Massachusetts Communities
Box 24, Folder 171988, December 9, Reply by FEMA to the Mass A.G.'s Motion to Compel Response by FEMA to Interrogatories and Requests for Production of Documents
Box 24, Folder 181988, December 14, Letter to Victor Stello, NRC, from FEMA
Box 24, Folder 191988, December, FEMA Region 1, Report of the Public Meeting for the Seabrook Nuclear Power Station Held on July 2, 1988
Box 25
Box 25, Folder 11988, December, Raviaw of the State of New Hampshire RERP for Seabrook Station, FEMA
Box 25, Folder 21988, December, Findings and Determinations Seabrook Nuclear Power Station
Box 25, Folder 31988, December, Review and Evaluation of the Seahrook Plan for MA. Communities
Box 25, Folder 41988, December, Review and Evaluation of the State of Maine Ingestion Pathway Plan for Seabrook Station
Box 25, Folder 51988, December, Status of Corrective Actions for the 1988 FEMA Graded Exercises for Seabrook Station
Box 25, Folder 61989, January 5, Letter to Brown, PSNH, re FEMA Consolidated Report on Seabrook Off-Site Planning and Preparedness
Box 25, Folder 71989, January 6, Certificate of Service
Box 25, Folder 81989, January 9, FEMA's Qpposition to Mass A.G.'s Motion to Compel and Supplemental Responses, etc
Box 25, Folder 91989, April 7, Forwarding of FEMA Findings on the Maine Ingestion Pathway Plan
Box 25, Folder 101979, April 21, FEMA Reply to MA. A.G.'s Motion to Compel Production of Documents from FEMA
Box 25, Folder 11Info Sheet re FEMA Drill
Box 25, Folder 121975-1980, NRC Evacuation Guides (Emergency Response Planning)
Box 25, Folder 13-151981-1983, NRC Safety Goals, 7/81 to 7/8
Box 25, Folder 161981, November 23, NRC CRAC/COMO
Box 26
Box 26, Folder 11981, November 23, NRC CRAC/COMO
Box 26, Folder 21981, May to August, NRC Proposed Rule Changeswith SAPL Annotations
Box 26, Folder 31981, December 15, Proposed NRC Rule Changes on Emergency Planning
Box 26, Folder 4-51982, January to November, Risk Analysis
Box 26, Folder 61982-1984, Probabilistic Risk Assessment, 1/82 to 2/84
Box 26, Folder 71982, Need for Power, NRC
Box 26, Folder 81983, January to November, ACRS Hearing, April 1 and 2, 1983
Box 26, Folder 91983, August, NRC Hearings
Box 27
Box 27, Folder 11984, July to September, Asseltine's Tour of Seabrook
Box 27, Folder 21984, September to December, NRC Severe Accident Policy
Box 27, Folder 31984, Environmental Qualifications of Electrical Equipment
Box 27, Folder 41984-1985, Source Terms
Box 27, Folder 51986-1987, FOIA Request for Information Dealing with Dose Calculations, 4/86 to 4/87
Box 27, Folder 61986, October, NRC Staff Draft Testimony for Congressional Hearing on Seabrook
Box 27, Folder 71986, October to December, NRC Correspondence re Worker's Allegations
Box 27, Folder 81986, NRC Litigation, "Next Round"
Box 27, Folder 91977, April 27, Newington Testimonies before the EPA re Atlantic Terminals Corporation
Box 27, Folder 101987, Fairness Doctrine
Box 27, Folder 111981, Academic Articles re Evacuation and Emergency Planning
Box 27, Folder 121983, April, "An Argument Versus Current Nuclear Power Generation Based on the Experiences of an Engineer," Markowitz, George T
Box 27, Folder 131982, August 19, Catawba-ASLAB-687
Box 27, Folder 141986, Comments on NHRERP by Ronald Kaufmann
Box 27, Folder 15Directory of Environmental Groups in New England
Box 27, Folder 161986, October, Drug and Alcohol Abuse at Seabrook
Box 28
Box 28, Folder 11975, December, "The Economics of Nuclear Power: A New England Perspective"
Box 28, Folder 2-41986-1987, EPZ Reduction Effort by New Hampshire Yankee, 7/86 to 3/87
Box 28, Folder 51983-1983, Emergency Workers, 6/82 to 3/83
Box 28, Folder 6-81980-1981, Evacuation Information
Box 28, Folder 9-11Evacuation Time Study, E.T.E.
Box 28, Folder 121982, October, "Further Analysis and Interpretation of the Shoreham Evacuation Plan"
Box 28, Folder 13-141975-1980, General Evac. Plans (Not NRC Guides)
Box 29
Box 29, Folder 11975-1980, General Evacuation Plans
Box 29, Folder 2Governor's Task Force on DOE's Crystalline Repository Project
Box 29, Folder 3-51983-1984, State Issues Committee, Greater Portsmouth Area Chamber of Commerce
Box 29, Folder 61984, Chamber Candidate's Breakfast
Box 29, Folder 71984-1985, Electric Rate Issue Subcommitte of the Greater Chamber of Commerce
Box 29, Folder 81986, Herb's Plan Critique Materials
Box 29, Folder 91981, HMM Reports
Box 29, Folder 101982, Independent Estimate of ETE for a Peak Population Scenario in the EPZ of Seabrook Nuclear Power Station, pp.i to iii-29
Box 29, Folder 111982, Independent Estimate of ETE, pp.iv to figure 14
Box 29, Folder 121982, Independent Estimate of ETE, pp.figure 15 to table 44
Box 29, Folder 131982, Independent Estimate of ETE, pp.table 45 to table 54
Box 29, Folder 141982, Independent Estimate of ETE, pp.table 55 to end
Box 29, Folder 151986, Miscellaneous Emergency Planning
Box 29, Folder 161985, Miscellaneous Emergency Prep, Evacuation Time Estimates
Box 30
Box 30, Folder 11986-1987, Miscellaneous Emergency Prep, Miscellaneous Material, 7/86 to 3/87
Box 30, Folder 21986-1987, Miscellaneous Emergency Prep, Sheltering Issues, 3/86 to 2/87
Box 30, Folder 31986-1987, Miscellaneous Emergency Prep, Traffic Issues, 7/86 to 8/87
Box 30, Folder 41986-1987, Miscellaneous Emergency Prep, Training, 3/86 to 3/87
Box 30, Folder 51982-1987, Miscellaneous Emergency Prep, Health and Medical Preparation, 4/82 to 3/87
Box 30, Folder 61982 to 1983, Misecellaneous, Related to Seabrook Operating License, 4/84 to 5/83
Box 30, Folder 71986, January to March, Non-SAPL, News Releases and Letters to the Editor
Box 30, Folder 81988, October 20, Notes from Deposition of George Gram
Box 30, Folder 91988, November 1, Notes from Deposition of Joseph Ellis
Box 30, Folder 101988, November 7, Notes from Deposition of Gilbert Cahill
Box 30, Folder 111988, November 10 and 11, Notes from Deposition of Richard W. Donovan
Box 30, Folder 12Nuclear Power and Psychology Related Matters
Box 30, Folder 131983, NRC Commissioners
Box 30, Folder 14Nuclear Waste in New Hampshire
Box 30, Folder 15Potassium Iodide
Box 30, Folder 161981-1983, Power Lines
Box 30, Folder 17PSCo Meeting Draft Copy on Evac Time Estimates
Box 31
Box 31, Folder 1"PSCo Evac Propaganda."
Box 31, Folder 2Radiological Monitoring in New Hampshire
Box 31, Folder 3Seabrook Unit II Delay
Box 31, Folder 4Seabrook Unit 2's Cancellation, Clippings
Box 31, Folder 5-71986, January, "The Source Term Debate," a Report by the Union of Concerned Scientists, (attachment 3 to the Affidavit of Gordon Thompson)
Box 31, Folder 81986, March, Special Transportation Needs
Box 31, Folder 9"Sununu's Whitewash Blue Ribbon Committee," To Review Post-Chernobyl Nuclear Safety Concerns
Box 31, Folder 101985, September to November, Three Mile Island Health Studies

Subseries C: Financial Issues

Box 32
Box 32, Folder 11980-1984, Seabrook Economics and Financing
Box 32, Folder 21981-1984, Stockholder Actions, 1/81 to 8/84
Box 32, Folder 31981-1985, Sununu's and PUC Cost Statements and Proposals
Box 32, Folder 41981, July, PUC Peak Demand Investigation
Box 32, Folder 51981, November to December, PUC Testimony Rate Case, DE 81-304, (SAPL Testified 12/81)
Box 32, Folder 6l981-1982, DE 81-312, Supply and Demand of NH for Electricity regarding Seabrook II. Fall 1982 to 1983, (11/81 to 12/82)
Box 32, Folder 71982, February 2, United Nuclear Opponents Press Conference on Seabrook Finances
Box 32, Folder 81982, March 10, Attempt to Intervene Before PUC on PSNH's Request to Sell 3 Million Shares of Common Stock, DF82 63 SAPL Appealed Exclusion from Hearing to NH Supreme Court
Box 32, Folder 91982, June, PUC DF 82-141 Bona Fide Response from Other Utilities in Attempted Selldown
Box 32, Folder 101982, July 7, Press Conference with Richard Rosen
Box 32, Folder 111982-1984, PSNH's Bond Rating
Box 32, Folder 121983, January to December, Cost cap Intervention
Box 32, Folder 131983, March to April, PUC Commissioners and Appointments
Box 32, Folder 141983-1984, Construction Completion Dates, 3/83 to 3/84
Box 32, Folder 151983, May to October, Joint Owners
Box 32, Folder 161983, July to October, Spirou on Seabrook
Box 32, Folder 171983, September, CAP Legislation
Box 32, Folder 181983, September to October, Bob's Press Conference on Sununu Charges
Box 32, Folder 191983, October 17, PSNH Rate Hike Request ($33 million, 9.45%)
Box 32, Folder 201983-1984, Rate Shocks, 10/83 to 10/84
Box 33
Box 33, Folder 11983-1984, Seabrook Capital Costs, 12/83 to 3/84
Box 33, Folder 21984, January to March, Town Warrant Article on Special Sessions
Box 33, Folder 31984, January to June, Donaldson, Lufkin and Jenrette
Box 33, Folder 41984, March, Jobs at Seabrook
Box 33, Folder 51984, March, Phantom Taxes
Box 33, Folder 61984, March to May, Palast's Study, "The Impact of Rising Electric Rates on the Economy of New Hampshire"
Box 33, Folder 71983-1984, Rate Shocks, 10/83 to 10/84
Box 33, Folder 81984-1986, Timeline Df 84-200, 3/84 to 1/86
Box 33, Folder 91984-1986, Appeal to New Hampshire Supreme Court, PUC Order in DF 84-200, June to Nov, 1985
Box 33, Folder 101984-1986, Briefs Before the PUC re 84-200, Campaign for Ratepayer's Rights' Initial Brief, March 15, 1985
Box 33, Folder 111984-1986, Briefs Before the PUC re Df 84-200, Brief on Behalf of SAPL
Box 33, Folder 121984-1986, Briefs Before the PUC re DF 84-200, Reply Brief on Behalf of SAPL
Box 33, Folder 131984-1986, Briefs Before the PUC re DF 84-200, Brief on Behalf of SAPL
Box 33, Folder 141984-1986, Briefing Miscellany for DF 84-200
Box 33, Folder 151984-1986, Commission Orders, Df 84-200, April to September 1985
Box 33, Folder 161984-1986, Cross Examination of Bruce Ellsworth
Box 33, Folder 17-181984-1986, Exhibits, DF 84-2Q0
Box 34
Box 34, Folder 11984-1986, Exhibits re Prices
Box 34, Folder 21984-1986, Hearings on PSNH's Request for Lifting of Spending Restrictions of $5m wk., July 1985
Box 34, Folder 31984-1986, Newsclips Bearing on DF 84-200 Case, 12/84 to 10/85
Box 34, Folder 41984-1986, Notes Etc., DF 84-200, March 1984 to January 1985
Box 34, Folder 51984-1986, Notes Etc., DF 84-200, November 1984 to February 1985
Box 34, Folder 61984-1986, Price Projections, Nominal and RWH from Aeschliman's Dissent
Box 34, Folder 71984-1986, Public Utilities Commission Final Order, DF 84 200, April 18, 1985
Box 34, Folder 81984-1986, Rosen's Testimony, DF 84-200
Box 34, Folder 9-101984-1986, SAPL's Motions re DF 84-200, July to September 1985
Box 34, Folder 111984-1986, Separate Opinion of Commissioner Aeschliman re 84-200
Box 34, Folder 12PUC Finance Hearing, PSNH Seeks Authorization to Issue May 24, 1984, DR 84-121
Box 35
Box 35, Folder 1PUC Finance Hearing
Box 35, Folder 21984, May to October, Newbrook, ("Newbroke")
Box 35, Folder 31984, June to July, Appeal of Roger Easton
Box 35, Folder 41984, June to August, Derivative and Class Action Suits
Box 35, Folder 51984, June to August, Derivative and Class Action Suits
Box 35, Folder 6-81984, June 24-25, Auth. to Borrow $425 Million, 84-168 Restructure of Agreements with Creditors
Box 35, Folder 91984, September, Touche-Ross
Box 35, Folder 101984, September, John N. Nassikas
Box 35, Folder 111984, September, PSNH's Petition for Original Jurisdiction
Box 35, Folder 121984-1985, Chapter 11 Option, 9/84 to 4/85
Box 35, Folder 131984, October, MAC Report
Box 35, Folder 141984, November, SAPL II, Appeal of SAPL Before State Supreme Court, 84-502
Box 35, Folder 151984, December 13, Maine PUC Order and NU Maine Co., etc
Box 36
Box 36, Folder 11984, February to November, PUC Hearing 83-398, Transfer of Question of RSA 378-50-A Interpretation to Supreme Court
Box 36, Folder 2-31984-1985, DF 83-360, Coop Case, 12/84 to 6/85
Box 36, Folder 41984, Cavanagh's Papers
Box 36, Folder 51984, Regional Meetings
Box 36, Folder 61985, March 15, Briefs Before the PUC for DF 84-200, Trial Brief of PSNH
Box 36, Folder 71985, March to September, Anti-Trust Investigation
Box 36, Folder 81985, April, MA. DPU Decision in DPU 84-152 (Seabrook Generic Finance Case)
Box 36, Folder 9-101985, June, "Seabrook: An Evaluation," Report by MMWEC
Box 36, Folder 111985, September, Appeal of the Conservation Law Foundation, Inc. to State of NH Supreme Court
Box 37
Box 37, Folder 11985, September to November, Notes on Arguments to Supreme Court, FEMA Preliminary Review of NH Plans, Amesbury Meeting
Box 37, Folder 21985, November 8, Opinion of PUC After Remand
Box 37, Folder 3-41985-1987, PSNH Form 10k
Box 37, Folder 51986, January 31, Supreme Court Ruling, Appeal of Conservation Law Foundation
Box 37, Folder 61986, March 3, Appeal of McCool and Eastman re 85-139
Box 37, Folder 71986, PSNH'a Avoided Cost Filing re SPP
Box 37, Folder 8Alternatives to Seabrook. Liscond Paper
Box 37, Folder 9-10CWIP, Construction Work in Progress
Box 37, Folder 111985, April, Gambit Report, "Is the NRC Licensing Unsafe Nuclear Power Plants?"
Box 37, Folder 12Lazar's Paper
Box 37, Folder 13Miscellaneous
Box 37, Folder 14Seabrook Investor, Central Maine Power
Box 37, Folder 15Seabrook Investor, Central Vermont Public Service
Box 38
Box 38, Folder 1Seabrook Investor, Connecticut Utilities
Box 38, Folder 2Seabrook Electric, Fitchburg Gas and Electric Co
Box 38, Folder 3Seabrook Investors, Massachusetts Municipal Wholesale Electric Company
Box 38, Folder 4Seabrook Investor, New England Power Company
Box 38, Folder 5Seabrook Investor, New Hampshire Electric Coop
Box 38, Folder 6Seabrook Investor, Vermont Electric Coop
Box 38, Folder 7Seabrook Investor, Vermont Public Service Board

Series 5: Miscellaneous Seabrook Documents from Soruces Other than SAPL, 1974-1988

(1 Box)
Box 1
Box 1, Folder 11974, June, Evacuation Risks - An Evaluation
Box 1, Folder 21980, August, Seabrook Station Evacuation Analysis, Final Report
Box 1, Folder 31980, August, Seabrook Station Evacuation Analysis, Technical Memorandum #1
Box 1, Folder 41981, November, Contract Between the New Hampshire Civil Defense Agency and Costello, Lomasney and deNapoli, Inc., Consulting Engineers To Develop a Radiological Emergency Response Plan for the Seabrook Nuclear Power Plant
Box 1, Folder 51984, January, Seabrook Station Public Alert and Notification System, Final Design Report
Box 1, Folder 61986, June, Final Exercise Assessment, Joint NH State and Local Radiological Emergency Response Exercise for the Seabrook Nuclear Power Plant
Box 1, Folder 7-101987, July, Risk Management Actions to Assure Containment Effectiveness at Seabrook Station
Box 1, Folder 111988, March 3, Comments of Mass. A.G. Shannon in Opposition to Nureg-0654/FEMA Rep. 1, Rev. 1, Supp.1, "Criteria for Utility Offsite Planning and Preparedness"
Finding Aid Image TEMP